flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design problems now the primary cause of construction claims and disputes

Codes and Standards

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.


By Peter Fabris, Contributing Editor | December 15, 2021
excavator
Courtesy Pixabay

Design problems are now the primary cause of construction claims and disputes, according to HKA's CRUX Insight 2020 report.

“Design problems are more likely to occur as a result of increasingly tight timescales imposed upon third parties engaged in design” that result in late or incomplete designs and conflict between the parties, the report says. “Failings in the management of third parties across increasingly complex supply chains” also cause major problems.

The consulting firm’s previous report had found that change in project scope was the number one cause for disputes. Projects have also become more prone to deficiencies in workmanship and unforeseen physical conditions, the report found.

The report’s data was primarily compiled before the start of the COVID-19 pandemic. The report examined construction issues in 1,185 projects worldwide with a combined value of $1.8 trillion. HKA expects an increase in arbitration over litigation to settle disputes in the coming years.

Related Stories

Codes and Standards | Jun 24, 2020

New API enables design and construction technology platforms to connect

Construction Specifications Institute offers “digital classification engine.”

Codes and Standards | Jun 23, 2020

State lawmakers encouraging transition to heat pumps for building heating

Policies aim to replace gas heaters with electric units.

Codes and Standards | Jun 22, 2020

Natl. Renewable Energy Labs, Cold Climate Research Ctr. team up on extreme weather research

Focus on renewable power, sustainable transportation, energy efficiency, and energy systems integration.

Codes and Standards | Jun 19, 2020

Demand for family rentals expected to jump over next few years

Developers’ focus on single, urban millennials leaves family market underserved.

Codes and Standards | Jun 17, 2020

AIA offers retail and office 3D models for reducing risk of COVID-19 transmission

For modifying stores and offices with 17-point architectural, engineering, and administrative framework.

Codes and Standards | Jun 17, 2020

Santa Fe is second city in the world to achieve LEED v4.1 Gold

New Mexico community gained credits for resilience planning, including public health crises.

Codes and Standards | Jun 15, 2020

NSF International’s Checked by NSF program helps businesses reopen safely

Includes third-party validation of COVID-19 preventive measures.

Codes and Standards | Jun 15, 2020

Workers want policy changes before they return to offices

More office cleaning, work from home opportunities, and staying home when sick among the desired adjustments.

Codes and Standards | Jun 12, 2020

Carbon emission legislation prompts commercial real estate to innovate

Mass timber, augmented reality, and modular construction among the trends.

Codes and Standards | Jun 11, 2020

USGBC offers new pilot credit to address green cleaning and COVID-19

Provides guidance on cleaning and disinfecting buildings using green cleaning best practices.

boombox1
boombox2
native1

More In Category




Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021