flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design problems now the primary cause of construction claims and disputes

Codes and Standards

Design problems now the primary cause of construction claims and disputes

More likely to occur due to more tight timescales imposed upon third parties engaged in design.


By Peter Fabris, Contributing Editor | December 15, 2021
excavator
Courtesy Pixabay

Design problems are now the primary cause of construction claims and disputes, according to HKA's CRUX Insight 2020 report.

“Design problems are more likely to occur as a result of increasingly tight timescales imposed upon third parties engaged in design” that result in late or incomplete designs and conflict between the parties, the report says. “Failings in the management of third parties across increasingly complex supply chains” also cause major problems.

The consulting firm’s previous report had found that change in project scope was the number one cause for disputes. Projects have also become more prone to deficiencies in workmanship and unforeseen physical conditions, the report found.

The report’s data was primarily compiled before the start of the COVID-19 pandemic. The report examined construction issues in 1,185 projects worldwide with a combined value of $1.8 trillion. HKA expects an increase in arbitration over litigation to settle disputes in the coming years.

Related Stories

Codes and Standards | Apr 3, 2017

New standard test method for static loading and impact on exterior shading released

The method provides a standard lab procedure evaluation of ice and snow loads and impacts.

Codes and Standards | Mar 30, 2017

WELL enters strategic partnership with developer of standards and assessment tools

GIGA’s RESET standard and data collection will be integrated into the WELL standard.

Codes and Standards | Mar 29, 2017

Climate-specific code changes target energy savings for tropical zones

Hawaii considers updated 2015 IECC tailored to its climate.

Codes and Standards | Mar 28, 2017

Safety concerns over wood-frame construction raised after Raleigh apartment fire

The unfinished building was destroyed in a five-alarm blaze.

Codes and Standards | Mar 27, 2017

Bills in Maryland Legislature would restrict use of wood in multifamily construction

American Wood Council and design and construction professionals are speaking out against the measure.

Codes and Standards | Mar 23, 2017

New manual of IT connectivity guidelines for commercial developments, redevelopments released

Mobile capacity planning, conduit points of entry, and electrical resiliency are covered.

Codes and Standards | Mar 22, 2017

Brick Industry Assn. study finds brick buildings cost less than precast, metal, and glass

The study compares costs in five categories of construction.

Codes and Standards | Mar 21, 2017

Calif. shopping center is first to earn BREEAM USA In-Use certification

The certification measures and monitors environmental performance of existing buildings.

Codes and Standards | Mar 20, 2017

Professional liability insurance rates for architects and engineers expected to be stable in 2017

Premiums leveled off in 2015, and claims have been stable, helping to hold costs down.

Codes and Standards | Mar 15, 2017

Energy Star program at risk

The standard-setting initiative for energy-efficient products may be a victim of Trump budget cuts.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021