flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

Multifamily Housing

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

Large corner plaza, activated walkways will add dynamic ground floor programming to the neighborhood.


By Peter Fabris, Contributing Editor | October 7, 2022
633 SE 3rd Ave tower, ODA, multifamily housing development
Courtesy VERO Digital

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises. The ODA-designed structure is composed of tubular volumes alternating between a sleek curved glazed façade and alternating wrap-around balconies. These elements generate a dynamic play that breaks up the massing of the building.

Setbacks and carved double-height voids enable a series of extensive roof deck amenities for residents at different levels with open city views. A large corner plaza and activated walkways will provide dynamic and lively ground floor programming for the neighborhood. The podium is lined with residential units that continue the tower expression and a dynamic three-dimensional parking screen façade paralleling the theme established by the cylindrical tower design.

At night, concave recesses of the parking façade create a decorative wall of light and textures that add to the ambiance of the neighborhood. These features aim to bring a heightened sense of sophistication to this part of the city—south of the New River in the Rio Vista neighborhood.

The 1,099,811 sf high-rise will accommodate 830 rental units—studios to 2 bedrooms—951 parking units, and 12,798 sf of retail space.

“Buildings at this scale house a community of people who live, work, and play from what they consider home,” said Eran Chen, founder and executive director, ODA. “This new lifestyle is formed by a building that is shaped to be flexible, create strong connections, and allows for diverse activities.”

On the building team:
Owner and/or developer: Dependable Equities
Design architect: ODA
Architect of record: ODA
MEP engineer: N/A
Structural engineer: N/A
General contractor/construction manager: N/A

ODA mixed use ext 2
Courtesy VERO Digital.
ODA mixed use ext 3
Courtesy VERO Digital.
ODA mixed use ext 4
Courtesy VERO Digital.

 

Related Stories

Multifamily Housing | Dec 4, 2019

9 tips on creating places of respite and reflection

We talked to six veteran landscape architects about how to incorporate gardens and quiet spaces into multifamily communities.

| Nov 20, 2019

ClosetMaid to celebrate 55 years in business at the 2020 NAHB International Builders Show

Company to celebrate 55 years in storage and organization with a visit by celebrity guest Anthony Carrino.

Multifamily Housing | Nov 14, 2019

U.S. multifamily market stays strong into 4th quarter 2019

October performance sets a record amid rising political pressure to cap rent growth, reports Yardi Matrix. 

Multifamily Housing | Nov 7, 2019

Multifamily construction market remains strong heading into 2020

Fewer than one in 10 AEC firms doing multifamily work reported a decrease in proposal activity in Q3 2019, according to a PSMJ report.

| Nov 6, 2019

Solomon Cordwell Buenz opens Seattle office, headed by Nolan Sit

National design firm brings residential high-rise expertise to the Pacific Northwest

| Nov 6, 2019

Passive House senior high-rise uses structural thermal breaks to insulate steel penetrations

Built to International Passive House standards, the Corona Senior Residence in Queens, N.Y., prevents thermal bridging between interior and exterior steel structures by insulating canopies and rooftop supports where they penetrate the building envelope.

Multifamily Housing | Nov 5, 2019

The Collective Paper Factory is the co-living company’s first U.S. location

The building offers a stay model ranging from one night to 29 days.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021