flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

Multifamily Housing

Design for new Ft. Lauderdale mixed-use tower features sequence of stepped rounded volumes

Large corner plaza, activated walkways will add dynamic ground floor programming to the neighborhood.


By Peter Fabris, Contributing Editor | October 7, 2022
633 SE 3rd Ave tower, ODA, multifamily housing development
Courtesy VERO Digital

The newly revealed design for 633 SE 3rd Ave., a 47-story, mixed-use tower in Ft. Lauderdale, features a sequence of stepped rounded volumes that ease the massing of the tower as it rises. The ODA-designed structure is composed of tubular volumes alternating between a sleek curved glazed façade and alternating wrap-around balconies. These elements generate a dynamic play that breaks up the massing of the building.

Setbacks and carved double-height voids enable a series of extensive roof deck amenities for residents at different levels with open city views. A large corner plaza and activated walkways will provide dynamic and lively ground floor programming for the neighborhood. The podium is lined with residential units that continue the tower expression and a dynamic three-dimensional parking screen façade paralleling the theme established by the cylindrical tower design.

At night, concave recesses of the parking façade create a decorative wall of light and textures that add to the ambiance of the neighborhood. These features aim to bring a heightened sense of sophistication to this part of the city—south of the New River in the Rio Vista neighborhood.

The 1,099,811 sf high-rise will accommodate 830 rental units—studios to 2 bedrooms—951 parking units, and 12,798 sf of retail space.

“Buildings at this scale house a community of people who live, work, and play from what they consider home,” said Eran Chen, founder and executive director, ODA. “This new lifestyle is formed by a building that is shaped to be flexible, create strong connections, and allows for diverse activities.”

On the building team:
Owner and/or developer: Dependable Equities
Design architect: ODA
Architect of record: ODA
MEP engineer: N/A
Structural engineer: N/A
General contractor/construction manager: N/A

ODA mixed use ext 2
Courtesy VERO Digital.
ODA mixed use ext 3
Courtesy VERO Digital.
ODA mixed use ext 4
Courtesy VERO Digital.

 

Related Stories

Multifamily Housing | May 25, 2021

A new condo tower in Brooklyn lets residents swim in the clouds

Brooklyn Point features an infinity pool that’s nearly 700 feet above the street.

Digital Twin | May 24, 2021

Digital twin’s value propositions for the built environment, explained

Ernst & Young’s white paper makes its cases for the technology’s myriad benefits.

Multifamily Housing | May 18, 2021

Multifamily housing sector sees near record proposal activity in early 2021

The multifamily sector led all housing submarkets, and was third among all 58 submarkets tracked by PSMJ in the first quarter of 2021. 

Multifamily Housing | May 13, 2021

Florida’s first LGBTQ+-focused affordable housing project for seniors opens

The project is located on The Pride Center’s five-acre Equality Park campus in Wilton Manors.

Mixed-Use | May 7, 2021

Mixed-use development tops out in Brooklyn’s Brownsville neighborhood

The project will bring 160 affordable housing units to the area.

Multifamily Housing | Apr 22, 2021

The Weekly Show, Apr 22, 2021: COVID-19's impact on multifamily amenities

This week on The Weekly show, BD+C's Robert Cassidy speaks with three multifamily design experts about the impact of COVID-19 on apartment and condo amenities, based on the 2021 Multifamily Amenities Survey.

Multifamily Housing | Apr 20, 2021

Two new residential towers set to rise in Nashville

Goettsch Partners is designing the buildings.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021