flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design industry lagging in meeting AIA 2030 Commitment goals, says AIA

Codes and Standards

Design industry lagging in meeting AIA 2030 Commitment goals, says AIA

Only 4% of projects have met the 70% energy savings target.


By Peter Fabris, Contributing Editor | October 26, 2016

Pixabay Public Domain

The American Institute of Architects released a report recently stating that the industry is lagging in meeting AIA’s 2030 Commitment goals

Each signatory to the 2030 Commitment program pledges to reach the goal of achieving carbon neutrality by 2030, and the industry has a long way to go to meet that goal. Only 4% of projects so far have met the 70% energy savings target for 2015 building performance, with the average savings coming in at 38%. 

“We have made some progress in the overall program, with a noteworthy jump in the amount of buildings included in the report,” said Greg Mella, FAIA, Director of Sustainable Design at SmithGroupJJR and co-chair of the AIA 2030 Working Group. “But we are simply not making significant strides in crucial metrics that predict building performance. These findings should serve as a wake-up call to architects that there needs to be greater urgency to drive improved energy efficiency across their project portfolios if we are going to reach our ultimate carbon reduction goals.”

The AIA said that roughly six in 10 of signatory firms employ energy modeling early in the design process, a strategy that it says is critical to meeting the 2030 goals. “Seeing more firms including energy modeling into their workflow is one of the encouraging takeaways from this report,” said Andrea Love, AIA, Director of Building Science at Payette and co-chair of the AIA 2030 Working Group. “This is exactly the sort of broad, cultural shift that is required to make serious inroads towards carbon reduction in buildings.”

Related Stories

Codes and Standards | Jun 10, 2019

Intl. Code Council releases Natural Disaster Preparedness Guide

Provides tips for staying safe during and after a hurricane or severe weather.

Codes and Standards | Jun 7, 2019

Market conditions indicate slower growth in industrial real estate sector

E-commerce, market oversupply, rising interest rates to dampen hot market.

Codes and Standards | Jun 3, 2019

Haskell invests in BLOX, creator of modular-based delivery method

‘Represents important part of Haskell’s future strategy,’ says CEO.

Codes and Standards | May 31, 2019

RELi 2.0 standard for sustainability, resilience being piloted

Will be open to LEED-registered or -certified projects, with introductory pricing and support.

Codes and Standards | May 24, 2019

USGBC receives funding for LEED for Cities and Communities Program

Bank of America provides $500,000 grant to certify 15 U.S. cities.

Codes and Standards | May 24, 2019

AIA updates Interiors Contract Documents

Six revised documents available for interior construction projects.

Codes and Standards | May 23, 2019

Northern California casino offers a template for resilient microgrids

Solar power with batteries and backup generators provide weeks of self-reliance.

Codes and Standards | May 23, 2019

Austin creates innovative plan to boost affordable housing

Approach includes loosened zoning, incentives for higher density in lower-cost and mixed-income developments.

boombox1
boombox2
native1

More In Category

Sustainability

Grimshaw launches free online tool to help accelerate decarbonization of buildings

Minoro, an online platform to help accelerate the decarbonization of buildings, was recently launched by architecture firm Grimshaw, in collaboration with more than 20 supporting organizations including World Business Council for Sustainable Development (WBCSD), RIBA, Architecture 2030, the World Green Building Council (WorldGBC) and several national Green Building Councils from across the globe.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021