flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design guidelines for retail space in NYC affordable housing projects released

Multifamily Housing

Design guidelines for retail space in NYC affordable housing projects released

Aimed at designing efficient, flexible ground-floor space.


By Peter Fabris, Contributing Editor | February 5, 2016
Design guidelines for retail space in NYC affordable housing projects released

Greenpoint Landing in Brooklyn, New York City, a megaproject with affordable rentals. Image courtesy Handel Architects, via Gothamist.

The Design Trust for Public Space and the New York City Department of Housing Preservation and Development (HPD) released the document “Laying the Groundwork: Design Guidelines for Retail & Other Ground-Floor Uses in Affordable Housing Developments.” 

The document is “a robust set of guidelines for designing efficient, flexible ground-floor space for retail and other community services in affordable housing developments,” according to a press release. “The guidelines offer feasible ways to improve economic vitality and streetscape in underserved neighborhoods.”

The document provides practical recommendations for building ground-floor space that is functional for retailers, community, and cultural organizations; accessible and convenient for residents and neighbors; and cost-effective for developers. Recommendations are included for:

  • Facade and signage
  • Exterior access and streetscape
  • Interior architecture: 
  • Mechanical (heating, cooling, and ventilation), electrical, plumbing; and fire protection systems:

For further information, visit here.

Related Stories

| Jan 3, 2012

Rental Renaissance, The Rebirth of the Apartment Market

Across much of the U.S., apartment rents are rising, vacancy rates are falling. In just about every major urban area, new multifamily rental projects and major renovations are coming online. It may be too soon to pronounce the rental market fully recovered, but the trend is promising.

| Dec 27, 2011

Ground broken for adaptive reuse project

Located on the Garden State Parkway, the master-planned project initially includes the conversion of a 114-year-old, 365,000-square-foot, six-story warehouse building into 361 loft-style apartments, and the creation of a three-level parking facility.

| Dec 12, 2011

Mojo Stumer takes top honors at AIA Long Island Design Awards

Firm's TriBeCa Loft wins "Archi" for interior design.

| Dec 5, 2011

Gables Residential brings mixed-use building to Houston's Tanglewood area

The design integrates a detailed brick and masonry facade, acknowledging the soft pastel color palette of the surrounding Mediterranean heritage of Tanglewood.

| Dec 2, 2011

What are you waiting for? BD+C's 2012 40 Under 40 nominations are due Friday, Jan. 20

Nominate a colleague, peer, or even yourself. Applications available here.

| Dec 2, 2011

Goody Clancy awarded Ohio State residential project

The project, which is focused on developing a vibrant on-campus community of learning for OSU undergraduates.

| Nov 29, 2011

Suffolk Construction breaks ground on Boston residential tower

Millennium Place III is a $220 million, 256-unit development that will occupy a full city block in Boston’s Downtown Crossing.

| Nov 15, 2011

Suffolk Construction breaks ground on the Victor housing development in Boston

Project team to manage construction of $92 million, 377,000 square-foot residential tower.

| Nov 15, 2011

Miller joins Perkins Eastman as regional manager, Middle East and Northern Africa

Miller joins Perkins Eastman with more than 48 years of experience in architecture, design management, and construction administration for planning and infrastructure.

| Nov 14, 2011

303 East 33rd Street building achieves LEED-NC

  The 165,000 sf 12-story residential building is the first green development to be LEED certified in the Murray Hill neighborhood of Manhattan.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021