flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.


By Las Vegas SC2 Challenge | May 7, 2014

In Las Vegas, the concept of awarding significant cash prizes for innovative and effective economic development solutions makes sense. The city recently launched its Strong Cities, Strong Communities (SC2) Challenge to do just that: tap the global design, architecture, land planning, and economic development community for the best economic development ideas.

Federally funded by a $1 million grant from the U.S. Department of Commerce’s Economic Development Administration, SC2 is an international prize competition awarded in 2012 to three U.S. cities: Las Vegas; Greensboro, N.C.; and Hartford, Conn. 

In Las Vegas, the competition can award up to $900,000 in prizes for transformational economic development plans to help revitalize four targeted areas within the city: Cashman Center, the Las Vegas Medical District, business parks and existing Redevelopment projects.

"Participating in the Strong Cities, Strong Communities Challenge is exciting for our city,” said Las Vegas Mayor Carolyn G. Goodman. “Las Vegas is known for its big, larger-than-life personality, so seeking big, out-of-the-box ideas is right in sync with our culture. We consider it a privilege to tap into the best and brightest minds globally and look forward to receiving some exciting, dynamic and innovative plans that will help specific areas of our city thrive and grow.”

The city is reaching far and wide to solicit the most qualified multidisciplinary teams in the fields of land planning, urban design, and other related fields to participate in this SC2 Challenge. The list of potential candidates includes leading professional firms as well as student teams from universities locally, regionally, and globally.

Winning plans must match Las Vegas’s needs, offer a feasible roadmap toward implementation, and represent innovative perspectives on economic development. The competition is divided into two phases.

During phase one, multidisciplinary teams submit economic vision proposals to the city for one of the four target areas. The top three proposals, as scored by members of an independent evaluation panel, will be submitted to the Las Vegas City Council to approve the receipt of cash prizes of $60,000 (1st place), $30,000 (2nd place), and $10,000 (3rd place), respectively. They and any other selected finalists will advance to phase two.

In phase two, finalists’ ideas will be expanded into comprehensive economic development plans for formal presentation and review by an esteemed panel of independent judges. Winners may receive cash prizes totaling up to $800,000 with a grand prize of $500,000.

Deadline to register for the Las Vegas SC2 Challenge is July 24. Phase one winners will be announced in November 2014, and phase two winners will be selected in May 2015. 

Related Stories

University Buildings | May 10, 2024

UNC Chapel Hill’s new medical education building offers seminar rooms and midsize classrooms—and notably, no lecture halls

The University of North Carolina at Chapel Hill has unveiled a new medical education building, Roper Hall. Designed by The S/L/A/M Collaborative (SLAM) and Flad Architects, the UNC School of Medicine’s new building intends to train new generations of physicians through dynamic and active modes of learning.

Sustainability | May 10, 2024

Perkins&Will’s first ESG report discloses operational performance data across key metrics

Perkins&Will recently released its first ESG report that discloses the firm’s operational performance data across key metrics and assesses its strengths and opportunities.

MFPRO+ News | May 10, 2024

HUD strengthens flood protection rules for new and rebuilt residential buildings

The U.S. Department of Housing and Urban Development (HUD) issued more stringent flood protection requirements for new and rebuilt homes that are developed with, or financed with, federal funds. The rule strengthens standards by increasing elevations and flood-proofing requirements of new properties in areas at risk of flooding. 

Government Buildings | May 10, 2024

New federal buildings must be all-electric by 2030

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry. 

Sustainable Development | May 10, 2024

Nature as the city: Why it’s time for a new framework to guide development

NBBJ leaders Jonathan Ward and Margaret Montgomery explore five inspirational ideas they are actively integrating into projects to ensure more healthy, natural cities.

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

Architects | May 8, 2024

Ivan O’Garro, AIA joins LEO A DALY as a vice president

Integrated design firm LEO A DALY welcomes Ivan O’Garro, AIA, as a vice president and managing principal of its Atlanta studio.

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

Biophilic Design | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

boombox1
boombox2
native1

More In Category




Adaptive Reuse

Detroit’s Michigan Central Station, centerpiece of innovation hub, opens

The recently opened Michigan Central Station in Detroit is the centerpiece of a 30-acre technology and cultural hub that will include development of urban transportation solutions. The six-year adaptive reuse project of the 640,000 sf historic station, created by the same architect as New York’s Grand Central Station, is the latest sign of a reinvigorating Detroit.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021