flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Design competition: $900,000 on the line in Las Vegas revitalization challenge

Las Vegas Mayor Carolyn Goodman wants your economic development ideas for remaking four areas within the city, including the Cashman Center and the Las Vegas Medical District.


By Las Vegas SC2 Challenge | May 7, 2014

In Las Vegas, the concept of awarding significant cash prizes for innovative and effective economic development solutions makes sense. The city recently launched its Strong Cities, Strong Communities (SC2) Challenge to do just that: tap the global design, architecture, land planning, and economic development community for the best economic development ideas.

Federally funded by a $1 million grant from the U.S. Department of Commerce’s Economic Development Administration, SC2 is an international prize competition awarded in 2012 to three U.S. cities: Las Vegas; Greensboro, N.C.; and Hartford, Conn. 

In Las Vegas, the competition can award up to $900,000 in prizes for transformational economic development plans to help revitalize four targeted areas within the city: Cashman Center, the Las Vegas Medical District, business parks and existing Redevelopment projects.

"Participating in the Strong Cities, Strong Communities Challenge is exciting for our city,” said Las Vegas Mayor Carolyn G. Goodman. “Las Vegas is known for its big, larger-than-life personality, so seeking big, out-of-the-box ideas is right in sync with our culture. We consider it a privilege to tap into the best and brightest minds globally and look forward to receiving some exciting, dynamic and innovative plans that will help specific areas of our city thrive and grow.”

The city is reaching far and wide to solicit the most qualified multidisciplinary teams in the fields of land planning, urban design, and other related fields to participate in this SC2 Challenge. The list of potential candidates includes leading professional firms as well as student teams from universities locally, regionally, and globally.

Winning plans must match Las Vegas’s needs, offer a feasible roadmap toward implementation, and represent innovative perspectives on economic development. The competition is divided into two phases.

During phase one, multidisciplinary teams submit economic vision proposals to the city for one of the four target areas. The top three proposals, as scored by members of an independent evaluation panel, will be submitted to the Las Vegas City Council to approve the receipt of cash prizes of $60,000 (1st place), $30,000 (2nd place), and $10,000 (3rd place), respectively. They and any other selected finalists will advance to phase two.

In phase two, finalists’ ideas will be expanded into comprehensive economic development plans for formal presentation and review by an esteemed panel of independent judges. Winners may receive cash prizes totaling up to $800,000 with a grand prize of $500,000.

Deadline to register for the Las Vegas SC2 Challenge is July 24. Phase one winners will be announced in November 2014, and phase two winners will be selected in May 2015. 

Related Stories

| Feb 15, 2011

AIA on President Obama's proposed $1 billion investment in energy conservation

The President’s budget increases the value of investment in energy conservation in commercial buildings by roughly $1 billion, reports AIA 2011 President Clark Manus, FAIA. The significant increase from the current tax deduction of $1.80 per sq. ft. now on the books is an increase for which the AIA has been advocating in order to encourage energy conservation.

| Feb 14, 2011

Sustainable Roofing: A Whole-Building Approach

According to sustainability experts, the first step toward designing an energy-efficient roofing system is to see roof materials and systems as an integral component of the enclosure and the building as a whole. Earn 1.0 AIA/CES learning units by studying this article and successfully completing the online exam.

| Feb 11, 2011

Four Products That Stand Up to Hurricanes

What do a panelized wall system, a newly developed roof hatch, spray polyurethane foam, and a custom-made curtain wall have in common? They’ve been extensively researched and tested for their ability to take abuse from the likes of Hurricane Katrina.

| Feb 11, 2011

RS Means Cost Comparison Chart: Office Buildings

This month's RS Means Cost Comparison Chart focuses on office building construction.

| Feb 11, 2011

Sustainable features on the bill for dual-building performing arts center at Soka University of America

The $73 million Soka University of America’s new performing arts center and academic complex recently opened on the school’s Aliso Viejo, Calif., campus. McCarthy Building Companies and Zimmer Gunsul Frasca Architects collaborated on the two-building project. One is a three-story, 47,836-sf facility with a grand reception lobby, a 1,200-seat auditorium, and supports spaces. The other is a four-story, 48,974-sf facility with 11 classrooms, 29 faculty offices, a 150-seat black box theater, rehearsal/dance studio, and support spaces. The project, which has a green roof, solar panels, operable windows, and sun-shading devices, is going for LEED Silver.

| Feb 11, 2011

BIM-enabled Texas church complex can broadcast services in high-def

After two years of design and construction, members of the Gateway Church in Southland, Texas, were able to attend services in their new 4,000-seat facility in late 2010. Located on a 180-acre site, the 205,000-sf complex has six auditoriums, including a massive 200,000-sf Worship Center, complete with catwalks, top-end audio and video system, and high-definition broadcast capabilities. BIM played a significant role in the building’s design and construction. Balfour Beatty Construction and Beck Architecture formed the nucleus of the Building Team.

| Feb 11, 2011

Kentucky’s first green adaptive reuse project earns Platinum

(FER) studio, Inglewood, Calif., converted a 115-year-old former dry goods store in Louisville, Ky., into a 10,175-sf mixed-use commercial building earned LEED Platinum and holds the distinction of being the state’s first adaptive reuse project to earn any LEED rating. The facility, located in the East Market District, houses a gallery, event space, offices, conference space, and a restaurant. Sustainable elements that helped the building reach its top LEED rating include xeriscaping, a green roof, rainwater collection and reuse, 12 geothermal wells, 81 solar panels, a 1,100-gallon ice storage system (off-grid energy efficiency is 68%) and the reuse and recycling of construction materials. Local firm Peters Construction served as GC.

| Feb 11, 2011

Former Richardson Romanesque hotel now houses books, not beds

The Piqua (Ohio) Public Library was once a late 19th-century hotel that sat vacant and deteriorating for years before a $12.3 million adaptive reuse project revitalized the 1891 building. The design team of PSA-Dewberry, MKC Associates, and historic preservation specialist Jeff Wray Associates collaborated on the restoration of the 80,000-sf Richardson Romanesque building, once known as the Fort Piqua Hotel. The team restored a mezzanine above the lobby and repaired historic windows, skylight, massive fireplace, and other historic details. The basement, with its low ceiling and stacked stone walls, was turned into a castle-like children’s center. The Piqua Historical Museum is also located within the building.

boombox1
boombox2
native1

More In Category

Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021