Washington, D.C. -- The Design-Build Institute of America (DBIA), the only organization that defines, teaches and promotes best practices in design-build, has released research indicating that design-build project delivery represents nearly 40 percent of total market share in the United States, based on dollar value at the end of 2012. This represents an eight percent growth increase since 2005. The geographic area with the highest design-build delivery market share is the Pacific region at 59 percent. In addition, research findings show the Military sector dominates design-build project delivery with an 81 percent market share.
In a study of 48,640 project specifications across nine building sectors and geographic regions, DBIA found commercial building was the second largest sector, followed by medical building for design-build project delivery in 2012. In addition, research fromDBIA reveals that market size, as defined as the potential share of design-build delivery according to dollar value, has doubled in the United States since 2005.
“The growth of design-build project delivery across geographic regions and building sectors throughout the United States exemplifies the cost and time efficiencies that can be achieved to benefit the owner, project team and surrounding communities,” says Lisa Washington, Executive Director/CEO, DBIA. “Design-build done right serves to advance our industry and our economy.”
A copy of the full report, “Design-Build Project Delivery Market Share and Market Size Report,” is available on DBIA’s web site. The report was compiled and analyzed by Reed Construction Data/RSMeans Market Intelligence in 2013, one of North America’s largest information providers to the design and construction industry.
Established in 1993, the Design-Build Institute of America (DBIA) is the only organization that defines, teaches and promotes best practices in design-build project delivery. Design-build is an integrated approach that delivers design and construction services under one contract with a single point of responsibility. Owners select design-build to achieve best value while meeting schedule, cost and quality goals. Learn more about design-build andDBIA’s certification and other programs at www.dbia.org.
Related Stories
Sponsored | Architects | Jul 19, 2017
Introducing StrXur by Bluebeam
Our goal is to present unique perspectives you may not be able to find anywhere else.
Sponsored | Accelerate Live! | Jul 13, 2017
Defining the future by mastering the art of change
From my perspective, what separates organizations thriving in the digital revolution from those who are not boils down to one thing: leadership.
Multifamily Housing | Jul 12, 2017
Midyear Rent Report: 26 states saw rental price increases in first half of 2017
The most notable rental increases are in growing markets in the South and Southwest: New Orleans, Glendale, Ariz., Houston, Reno, N.V., and Atlanta.
Giants 400 | Jul 12, 2017
Innovation abounds, but will it lead to growth for AEC Giants?
Engineering firms such as Arup, Glumac, and Thornton Tomasetti are leveraging their in-house expertise to develop products and tools for their design teams, clients, and even the competition.
Multifamily Housing | Jul 12, 2017
7 noteworthy multifamily projects: posh amenities, healthy living, plugged-in lifestyle
Zen meditation gardens, bocce courts, saltwater pools, and free drinks highlight the niceties at these new multifamily developments.
Accelerate Live! | Jul 6, 2017
Watch all 20 Accelerate Live! talks on demand
BD+C’s inaugural AEC innovation conference, Accelerate Live! (May 11, Chicago), featured talks on machine learning, AI, gaming in construction, maker culture, and health-generating buildings.
Healthcare Facilities | Jun 29, 2017
Uniting healthcare and community
Out of the many insights that night, everyone agreed that the healthcare industry is ripe for disruption and that communities contribute immensely to our health and wellness.
Architects | Jun 25, 2017
Stantec adds RNL Design to its stable, fortifying several of its business units
The engineering giant also names successor to CEO who will retire at the end of this year.
Building Team | Jun 22, 2017
Seven lessons learned on commissioning projects
Commissioning is where the rubber meets the road in terms of building design.
Sponsored | Building Team | Jun 20, 2017
Plan ahead when building in the west
Getting a project through plan review can be an unusually long process, anywhere from six months to two years.