Washington, D.C. -- The Design-Build Institute of America (DBIA), the only organization that defines, teaches and promotes best practices in design-build, has released research indicating that design-build project delivery represents nearly 40 percent of total market share in the United States, based on dollar value at the end of 2012. This represents an eight percent growth increase since 2005. The geographic area with the highest design-build delivery market share is the Pacific region at 59 percent. In addition, research findings show the Military sector dominates design-build project delivery with an 81 percent market share.
In a study of 48,640 project specifications across nine building sectors and geographic regions, DBIA found commercial building was the second largest sector, followed by medical building for design-build project delivery in 2012. In addition, research fromDBIA reveals that market size, as defined as the potential share of design-build delivery according to dollar value, has doubled in the United States since 2005.
“The growth of design-build project delivery across geographic regions and building sectors throughout the United States exemplifies the cost and time efficiencies that can be achieved to benefit the owner, project team and surrounding communities,” says Lisa Washington, Executive Director/CEO, DBIA. “Design-build done right serves to advance our industry and our economy.”
A copy of the full report, “Design-Build Project Delivery Market Share and Market Size Report,” is available on DBIA’s web site. The report was compiled and analyzed by Reed Construction Data/RSMeans Market Intelligence in 2013, one of North America’s largest information providers to the design and construction industry.
Established in 1993, the Design-Build Institute of America (DBIA) is the only organization that defines, teaches and promotes best practices in design-build project delivery. Design-build is an integrated approach that delivers design and construction services under one contract with a single point of responsibility. Owners select design-build to achieve best value while meeting schedule, cost and quality goals. Learn more about design-build andDBIA’s certification and other programs at www.dbia.org.
Related Stories
Healthcare Facilities | Feb 1, 2018
Early supplier engagement provides exceptional project outcomes
Efficient supply chains enable companies to be more competitive in the marketplace.
Industry Research | Jan 30, 2018
AIA’s Kermit Baker: Five signs of an impending upturn in construction spending
Tax reform implications and rebuilding from natural disasters are among the reasons AIA’s Chief Economist is optimistic for 2018 and 2019.
Market Data | Jan 30, 2018
AIA Consensus Forecast: 4.0% growth for nonresidential construction spending in 2018
The commercial office and retail sectors will lead the way in 2018, with a strong bounce back for education and healthcare.
Architects | Jan 29, 2018
14 marketing resolutions AEC firms should make in 2018
As we close out the first month of the New Year, AEC firms have made (and are still making) plans for where and how to spend their marketing time and budgets in 2018.
Education Facilities | Jan 29, 2018
My day as a kindergartner
The idea of a kindergarten-only school presents both challenges and opportunities in regards to the design.
AEC Tech | Jan 29, 2018
thyssenkrupp tests self-driving robot for ‘last mile’ delivery of elevator parts
“With driverless delivery robots, we could fill a gap and get spare parts from our warehouses to the jobsite faster,” said thyssenkrupp SVP Ivo Siebers.
Architects | Jan 26, 2018
Stephen Ayers, FAIA, honored with the 2018 AIA Thomas Jefferson Award
The award honors significant contributions to public architecture.
Architects | Jan 26, 2018
Recipients for the 2018 Collaborative Achievement Award selected
The recipients will be honored at the AIA Conference on Architecture 2018 in New York City.
K-12 Schools | Jan 25, 2018
Cost estimating for K-12 school projects: An invaluable tool for budget management
Clients want to be able to track costs at every stage of a project, and cost estimates (current and life cycle) are valuable planning and design tools, writes LS3P's Ginny Magrath, AIA.
Architects | Jan 25, 2018
Four keys to designing autistic-friendly spaces
Autism, in part, gave us modern architecture, writes PDR’s Julie Troung.