flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Design activity at architecture firms finally back to pre-recession levels: AIA report

Design activity at architecture firms finally back to pre-recession levels: AIA report

Gross billings at architecture firms have increased by 20% since 2011, according to AIA.


By AIA | October 6, 2014

As the U.S. construction industry continues to rebound from the downturn in the past economic cycle, "The Business of Architecture: 2014 AIA Firm Survey Report" shows that design activity at architecture firms has recovered to pre-recession levels.

Most firms have seen revenue levels at least stabilize, if not finally begin to grow with gross billings at architecture firms increasing by 20% from 2011.   

Key findings include:

  • With losses during the economic downturn, architecture firms have become smaller and younger with 43% having been founded since the year 2000, with one-third of those firms founded just since 2010.
  • Renovations of existing facilities account for a larger share of design activity than during the last construction boom.
  • Nearly two-thirds of large firms worked on international projects in 2013.
  • Over a third of architecture firms nationally—and virtually all larger firms—were using some form of BIM for billable projects.
  • Twelve percent of firms are using energy modeling software for billable projects.
  • Twenty-one percent of firms have worked on one or more projects that incorporate resilient design strategies.
  • Even with most of the institutional building category remaining in recession in 2013, this sector generated half of the billings at architecture firms.
  • Within the institutional category, education facilities accounted for 21% of overall billings.

The full survey is available for purchase here.

Related Stories

| Jan 9, 2012

Thornton Tomasetti acquires green consulting firm Fore Solutions

International engineering firm launches new building sustainability practice.

| Jan 9, 2012

METALCON International 2012 announced

METALCON 2012 is scheduled for Oct. 9-11 at the Donald E Stephens Convention Center, Hall A, Rosemont, Ill.

| Jan 9, 2012

Lutron appoints Pessina president

In his 35-year career with Lutron, Pessina has acquired broad experience in the engineering, quality assurance and manufacturing areas. 

| Jan 9, 2012

A new journey for KSS Architects co-founder

Kehrt's legacy of projects include Rutgers University's Biomedical Engineering Building, the renovation and expansion of Cornell University School of Hotel Administration, the recent new campus center at The Richard Stockton College of New Jersey and Princeton Township's Municipal Complex. 

| Jan 8, 2012

TCA releases The Construction of Tilt-Up

The newest publication from the TCA is the second in a planned trilogy of resources covering the architecture, engineering and construction of Tilt-Up

| Jan 8, 2012

WHR Architects promotes Joel Colwell, AIA, to principal

With over 30 years of experience, Colwell has managed large-scale, complex projects for major healthcare systems as well as challenging smaller renovations and additions — all with notable success.

| Jan 6, 2012

Doug Wignall named president of HDR Architecture

HDR Architecture, Inc. is known for its award-winning designs for urban environments, campuses and buildings in the healthcare, science and technology, civic, justice and higher education markets.

| Jan 6, 2012

Gensler unveils restoration and expansion of Houston's Julia Ideson building

The "new" building will serve as a repository of Houston memorabilia and rare archival material as well as the city's official reception space and a venue for exhibits, meetings and other special events.

| Jan 6, 2012

New Walgreen's represents an architectural departure

The structure's exterior is a major departure from the corporate image of a traditional Walgreens design.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021