flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

Dept. of Labor reaches settlement for $5 million in back wages for workers on federally assisted project

MDG Design & Construction to pay contractors for failing to pay prevailing wages on rehab of New York apartment tower


By Peter Fabris, Contributing Editor | July 1, 2014
Photo: Dept. of Labor
Photo: Dept. of Labor

The U.S. Department of Labor and MDG Design & Construction LLC have reached a settlement over wage violations atthe federally-assisted 26-story Grand Street Guild rehab project in New York City’s Lower East Side. MDG and other firms involved will pay $3.8 million in back wages and fringe benefits to about 200 of MDG’s subcontractors’ construction workers.

Previous investigations led to the repayment of more than $1.1 million in back wages to 300 laborers and mechanics who worked for MDG’s subcontractors.The contractors have also agreed to expansive compliance measures to prevent future violations.

The labor department’s Wage and Hour Division found numerous Davis-Bacon and Related Acts violations by MDG subcontractors, including failure to pay required prevailing wages and submitting inaccurate or falsified payroll records to the government. As part of the settlement, MDG will retain an independent monitor for three years with responsibilities for conducting regular reviews of the company and its subcontractors to confirm compliance with applicable wage and hour laws on all prevailing wage and federally-assisted projects.

In addition to MDG, the settlement agreement includes Charis Consulting LLC, Kona Contracting LLC, as well as Michael Rooney and Nicola DeAcetis — owners of all three companies — and Neys Escobar, an owner of Kona. All of the companies are based in Huntington Station, N. Y.

(http://www.dol.gov/opa/media/press/whd/WHD20140967.htm)

Related Stories

Codes and Standards | Sep 7, 2021

Boston turns to developer fees to fund flood protection infrastructure

Assessments on commercial properties will help build seawall and other protective measures.

Codes and Standards | Sep 3, 2021

Low-cost methods can have substantial impact on reducing embodied carbon

Whole-building design, material substitution, and specification strategies can slash carbon by up to 46%.

Codes and Standards | Sep 2, 2021

Case for power resiliency in buildings grows with more disaster and outages

Essential businesses like data centers, hospitals are first adopters of new storage systems.

Codes and Standards | Aug 31, 2021

UK industry group wants mandatory whole-life carbon assessments of buildings

Aims to address hidden emissions embedded in supply chains.

Codes and Standards | Aug 31, 2021

Home electrification will require code upgrades

Residential electric panel capacity must be increased.

Codes and Standards | Aug 30, 2021

Facebook’s new $800 million Arizona data center to save big on water

Will restore more than 200 million gallons of water per year to river basins.

Codes and Standards | Aug 26, 2021

California may require solar on new high-rise residential and commercial buildings

State energy commission approves proposal; Could become law in 2023.

Codes and Standards | Aug 25, 2021

Study finds racism, discrimination common in construction industry

NIBS to share best practices with industry leaders to improve worker treatment.

Codes and Standards | Aug 24, 2021

White paper addresses insulated metal panel specifications for roofs and walls

Pertains to provisions of the National Building Code of Canada.

Codes and Standards | Aug 24, 2021

KTGY releases free resource to reduce carbon footprint in multifamily developments

Helps navigate Denver Green Code measures—a series of voluntary codes.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021