flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Energy seeks input on building-integrated photovoltaic systems

Codes and Standards

Dept. of Energy seeks input on building-integrated photovoltaic systems

Integrating solar generation into building components could boost material and supply chain efficiencies and reduce costs.


By Peter Fabris, Contributing Editor | March 17, 2022
Solar energy technology
Courtesy Pixabay

Integrating solar generation into building components could boost material and supply chain efficiencies and reduce costs
 
The U.S. Department of Energy (DOE) Solar Energy Technologies Office (SETO) and Building Technologies Office (BTO) recently issued a request for information to gather input on technical and commercial challenges and opportunities for building-integrated photovoltaic (BIPV) systems.
 
Roof-mounted solar systems on buildings are more common, but BIPV systems offer other ways to site solar technologies on buildings. The options include directly integrating solar modules into the roof or the building’s facade.
 
Integrating solar generation directly into building components could improve material and supply chain efficiencies and reduce system costs, the department says. “Innovative strategies that use building-integrated photovoltaics can improve solar integration, enable new designs and uses, and support our decarbonization goals,” says Kelly Speakes-Backman, principal deputy assistant secretary for the Office of Energy Efficiency and Renewable Energy.
 
The goal of the RFI is to identify and quantify barriers to BIPV deployment and inform future strategy and program development in this area. SETO and BTO are seeking feedback from industry, research laboratories, academia, government agencies, and other stakeholders related to BIPV technologies and markets.
 
The deadline for responses is April 1, 2022.

Related Stories

| Sep 18, 2014

OSHA announces new requirements for reporting deaths and severe injuries

The U.S. Department of Labor's Occupational Safety and Health Administration announced a final rule requiring employers to notify OSHA when an employee is killed on the job or suffers a work-related hospitalization, amputation, or loss of an eye.

| Sep 18, 2014

Eugene, Ore., passes ordinance to achieve steep energy consumption reductions

The Eugene, Ore., City Council recently passed an ordinance aimed at steeply reducing energy consumption and greenhouse gas emissions.

| Sep 10, 2014

Nine out of 10 New York City building plans fail energy code test

Earlier this year, New York City's Department of Buildings began auditing thousands of architectural plans for new and renovated office and residential buildings.

| Sep 10, 2014

AIA, CSI, and NIBS publish updated national CAD standard, includes new BIM module

The NCS helps architects, constructors and operators coordinate efforts by classifying electronic design data consistently and making information retrieval easier, the industry groups say. 

| Sep 10, 2014

Perry named new director of OSHA’s Standards and Guidance Directorate

Bill Perry has been named new director of the OSHA’s Directorate of Standards and Guidance, effective Aug. 24, 2014.

| Sep 10, 2014

ASHRAE proposes verification for energy standard

The ASHRAE/IES energy standard would have multiple compliance options to ensure verification of delivered building envelope performance under a new proposal.

| Sep 2, 2014

Micro-apartment concept can’t get traction in Boston suburb

Micro-apartments are gaining acceptance in nearby Boston and in places such as San Francisco and New York, but Weymouth, Mass., officials and neighbors were not receptive to a proposal for tiny dwellings this summer.

| Sep 2, 2014

Montreal borough leader urges city to issue green roof guidelines

The mayor of Montreal's Saint-Laurent borough wants Quebec's housing authority to speed up its plan to publish construction guidelines for green roofs.

| Sep 2, 2014

Proposed federal rules would create more stringent healthcare facility safety rules

A key change is a requirement that buildings over 75 feet tall have sprinkler systems throughout the structure. Existing buildings would have 12 years to install them.

| Sep 2, 2014

Construction unions, housing activists press New York mayor on affordable apartment projects

A group of New York City construction unions have joined forces with affordable housing activists to pressure Mayor Bill de Blasio to require organized labor on construction of 80,000 lower-cost apartment units.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021