flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools

Codes and Standards

Dept. of Energy releases updated versions of EnergyPlus and OpenStudio building energy modeling tools

The updated versions include full support for variable speed DX coils, enhanced plant auto-sizing, new fan model, and support for non-rectangular windows.


By Peter Fabris, Contributing Editor | April 19, 2017

Pixabay Public Domain

The U.S. Department of Energy and the National Labs have released updated versions of their open-source, whole-building energy modeling tools: the EnergyPlus engine and the OpenStudio software development kit and application.

EnergyPlus V8.7.0 includes the following enhancements:

  • New features to support residential modeling including a new attic duct model and the Kiva ground heat exchange model.
  • Support for non-rectangular windows.
  • A new generalized fan model.
  • Enhanced plant auto-sizing.
  • Full support for variable speed DX coils.
  • Regular expression support in output variables for easier report generation.
  • A refactored output module for improved performance.

The release also includes resolutions and fixes to 50 known bugs and issues.

OpenStudio 2.1.0 has a new feature, a completely revamped Parametric Analysis Tool (PAT) application. The interface has been rewritten in JavaScript to leverage the browser-based Electron framework. The back end also uses the new OpenStudio 2.0 Server architecture, including OpenStudio Command Line Interface (CLI), OpenStudio Meta-CLI, and the new OpenStudio Workflow (OSW) and OpenStudio Analysis (OSA) file formats. The new PAT supports both local and cloud-based execution and adds support for “algorithmic” workflows like uncertainty quantification, design optimization, large-scale parametric analysis, and model input calibration that can automatically generate large numbers of runs. Use of the new file formats means that the new PAT is not compatible with PAT 1.X projects.

More information about all of DOE’s energy modeling software and research projects can be found at https://energy.gov/eere/buildings/building-energy-modeling

Related Stories

Codes and Standards | Jan 22, 2020

Potential energy savings from smart meters is largely unrealized

Most utilities underuse the technology that can help customers save money.

Codes and Standards | Jan 21, 2020

Contractors pay practices reviewed in new database

Fastest and slowest paying GCs revealed.

Codes and Standards | Jan 17, 2020

Several states with ambitious climate goals will have to restrict natural gas as a fuel

Buildings would have to heat and cook with electricity.

Codes and Standards | Jan 16, 2020

New solar-ready mandate affects commercial and residential buildings in St. Louis

All new buildings must have reserved rooftop sections for PVs.

Codes and Standards | Jan 14, 2020

L.A.’s expedited permitting process credited with faster approvals on $1 billion project

Parallel Design-Permitting Process includes flagging elements for correction during conceptual design.

Codes and Standards | Jan 13, 2020

Kansas City is first in nation to offer free public transportation

Aim is to increase mobility to spur more economic activity.

Codes and Standards | Jan 9, 2020

Dept. of Defense will require beefed up cybersecurity standards in January

All contractors will have to demonstrate secure practices.

Codes and Standards | Jan 8, 2020

2019 Oregon Zero Energy Ready commercial code will boost efficiency by 14%

ASHRAE 90.1 is the basis for new code that went into effect Oct. 1.

Codes and Standards | Jan 8, 2020

Energy efficiency initiatives have significantly cut energy consumption per square foot

Lighting and space heating fell by more than 600 trillion Btu from 2003 to 2012.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021