The U.S. Department of Energy, the Lawrence Berkeley National Laboratory, and the National Renewable Energy Laboratory have released the initial version of the Spawn of EnergyPlus software.
The government entities collaborated with Modelon and Objexx Engineering on the new tool. Spawn is not a replacement for EnergyPlus and won’t be in the foreseeable future.
Like its progenitor, the new tool performs whole-building energy simulation, but it also targets new use cases in advanced controls, district systems, and grid integration. Spawn supports these new use cases by making fundamental use of coupled simulation via the Functional Mockup Interface standard.
It reuses the weather, envelope, lighting, and loads models from EnergyPlus and packages them as a single model. But it replaces EnergyPlus’ traditional, imperative, implicit, load-based HVAC and controls models with explicit declarative state-based models from the Modelica Buildings Library that are translated and automatically linked with the EnergyPlus model.
By combining models in different configurations, Spawn simulates either a single building or a collection of buildings linked by shared thermal, electrical, and control systems.
Related Stories
| Sep 11, 2013
USGBC Florida Chapter survey to help contractors adopt sustainable practices
Contractors in Florida could benefit from a data collection project by the state's chapter of the U.S. Green Building Council.
| Sep 11, 2013
Disability, vet hiring standards for contractors are goals, not quotas
Contractors that fall short of new federal hiring rules concerning veterans and disabled persons will not necessarily incur penalties, says Patricia Shiu, director of the Office of Federal Contract Compliance Programs.
| Sep 11, 2013
Sports stadium accidents suggest code updates may be necessary to prevent falls
Since 2000, at least three individuals have died as a result of falling from the upper decks of stadiums in the United States. In addition, eight non-fatal falls have occurred in stadiums and arenas over that time.
| Sep 11, 2013
White paper examines Joint Commission requirements for NFPA codes in healthcare
The healthcare industry has experienced great attention from The Joint Commission concerning fire and life safety issues.
| Sep 11, 2013
San Francisco expected to drop firefighter air tank refilling station rule for skyscrapers
San Francisco is poised to drop a requirement that skyscrapers have refill stations so firefighters can recharge their air tanks during a blaze. The city has required that new high-rises have the air refill systems for about ten years.
| Sep 5, 2013
State legislatures continue to raise the bar on green school construction
Since the beginning of 2013, the USGBC has followed more than 125 bills across 34 states that seek to advance healthy, high-performing schools.
| Sep 5, 2013
Construction industry groups create coalition to respond to new OSHA silica rule
A group of 11 construction trade associations has created the Construction Industry Safety Coalition in response to the Occupational Safety and Health Administration’s (OSHA) proposed rule on silica for the construction industry.
| Sep 5, 2013
Red tape delays California county jail construction projects
California authorized $1.2 billion for jail construction in 2007, but not a single county in the state has completed a jail project since then.
| Sep 5, 2013
New CM-at-risk and design-build options create controversy in Ohio
Some contractors say Ohio's new system puts small and midsize construction companies at a disadvantage.
| Sep 5, 2013
Outdated codes slowed disaster recovery in Tuscaloosa, Ala.
Outdated building codes and lack of a master plan slowed the initial rebuilding stage after a devastating tornado leveled parts of Tuscaloosa, Ala. in 2011, according to the city’s mayor.