The City of Denver has released a plan to decarbonize existing homes and buildings within the city limits and beyond to Denver County.
The heart of the plan is to replace traditional gas space and water heating appliances with electric heat pumps that are powered by renewable energy. The city moved ahead with the initiative buoyed by a commitment made by Xcel Energy, Denver’s utility, to generate 80% of Denver’s electricity by renewables by 2030.
Today, 97% of natural gas consumed in buildings and homes is used for space and water heat, the city says. Emissions from these uses account for 24% of Denver’s total greenhouse gas emissions.
The city says that under the plan, 66% of homes, 69% of multifamily units, and 49% of commercial buildings can be fully electrified when existing systems reach their end of life. This would keep total capital and operating costs within 10% of baseline costs under existing electricity and gas rates.
The plan strives for racial and economic equity in achieving these goals in a “managed transition” to electrification.
Related Stories
Codes and Standards | Apr 5, 2019
Manhattan expected to adopt congestion pricing plan for automobiles
New York would be first U.S. city to charge drivers extra for downtown motoring.
Codes and Standards | Apr 4, 2019
Chicago makes major building code overhaul
Previous comprehensive changes were done 70 years ago.
Codes and Standards | Apr 3, 2019
Construction advanced materials makers can enhance industry efficiency with technology
Integration of new IT approaches in construction with new materials has potential to enhance sustainability, alleviate worker shortage.
Codes and Standards | Apr 2, 2019
Open offices reduce collaboration among employees
Counterintuitive finding makes value of wide open workspaces questionable.
Codes and Standards | Mar 29, 2019
New timber traceability LEED credit released
Pilot credit aims to reduce use of illegal wood in buildings.
Codes and Standards | Mar 28, 2019
Swinerton forms new mass timber business group
Will pursue new projects being developed with mass timber.
Codes and Standards | Mar 27, 2019
Shortage of skilled construction workers resulting in missed deadlines
Some 40% of contractors have turned down project offers.
Codes and Standards | Mar 25, 2019
ICC release 2019 guidelines for safe use of repurposed shipping containers
Provides in-depth, technical overview on how to design, review, and approve shipping containers as building elements.
Codes and Standards | Mar 22, 2019
Tool helps cities develop framework for life-cycle energy policies and track progress
Identifies policies, funding sources to address building energy use.
Codes and Standards | Mar 21, 2019
New York City contractors adding 5% to 10% to construction costs due to trade war
Tariffs on steel, aluminum, and other materials swell budgets.