flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Denver transit project wins design-build Project of the Year honor

Denver transit project wins design-build Project of the Year honor

The Denver Union Station Transit Improvement Project is among 25 projects honored by the Design Build Institute of America for excellence in design-build project delivery.


By Design-Build Institute of America | October 8, 2014

The Design Build Institute of America (DBIA) has announced the 2014 Project of the Year and National Award of Excellence winners.

The Denver Union Station Transit Improvement Project has been bestowed with DBIA's highest honor, Project of the Year, with Agua Nueva, Golisano Institute for Sustainability, Henry M. Jackson Federal Building Modernization, and the San Diego International Airport Terminal 2 and Airside Expansion projects being specially recognized for excellence in the critical areas of design, process and teaming.

"This year's award competition was the most rigorous to date with a greater emphasis on best practices and teamwork, as well as the successful delivery of the project," says Lisa Washington, CAE, DBIA's Executive Director/CEO.

Recognized for exemplary collaboration and integration in design-build project delivery, the award-winning projects were evaluated by a distinguished panel of industry experts. This year, 25 projects in nine categories were awarded National Awards of Merit.

One project in each of the nine categories was then considered for best in category as a National Award of Excellence winner along with Excellence in Design, Process and Teaming awards and Project of the Year. The selected projects showcase design-build best practices, in addition to achieving budget and schedule goals and exceeding owner expectations. All photos courtesy of DBIA.

 

DBIA 2014 Project of the Year – Denver Union Station Transit Improvements Project

(pictured above)

The Denver Union Station Transit Improvements Project transformed 20 acres of blighted former rail yards into the vibrant centerpiece of a bustling downtown Denver, anchoring and facilitating connections between the region's transit system with all modes of public transit: an iconic, eight-track commuter rail train hall, new light-rail station and an airy, airport-like underground bus concourse with 22 bays for regional and commercial bus service. At $374.8 million and spanning 20 acres and seven city blocks, it is the largest multimodal project to seek LEED Silver certification from the USGBC. The project is a Public-Private Partnership (P3) successfully delivered under a design-build contract model.

The Project of the Year team includes: Owner: Denver Union Station Project Authority; Design-Builder, Construction Manager: Kiewit; Architect: Skidmore, Owings, and Merrill LLP; Engineer: AECOM; BIM Specialist/Construction: Legacy Mechanical Inc.; and Specialty Consultant: Hargreaves Associates.

"The remarkable Denver Union Station Project is a shining example of what can be accomplished through Design-Build Done Right," says Lisa Washington. "The project team truly took integrated project delivery to the next level by releasing design packages in alignment with construction activities, embedding lead architects and engineers in the contractors' offices and through weekly owner/architect/contractor meetings to ensure key decision-makers were frequently engaged. We could not be more proud to present this prestigious award to the Denver Union Station Project Authority and the entire project team as DBIA's 2014 Design-Build Project of the Year."

 

 

DBIA 2014 Excellence in Design – Golisano Institute for Sustainability and the Governor George Deukmejian Courthouse

The Golisano Institute for Sustainability at Rochester Institute of Technology (RIT) in Rochester, N.Y., wanted a signature building that would serve as a living laboratory for scientific discovery and experimental learning that could serve as the Western Gateway to RIT. The result is an 84,000-square-foot complex, comprised of a four-story research and three-story academic and office building connected by a four-story galleria. It houses laboratories, classrooms and office space, with high-performance design features that make it a living laboratory of sustainability. The Golisano Institute is among the first in the world to offer a Ph.D. program in sustainability.

 

The Governor George Deukmejian Courthouse was delivered through a unique Public-Private Partnership and is the first social infrastructure project in the United States procured under the principles of Performance-Based Infrastructure contracting. Constructed in downtown Long Beach, Calf., the design-build team successfully delivered the spectacular 545,000-square-foot courthouse and 399,000-square-foot parking facility 11 days ahead of schedule.

 

 

DBIA 2014 Excellence in Process – Agua Nueva Water Reclamation Facility

The Pima County Regional Wastewater Reclamation Department embarked on the largest capital program in its history, which includes the $172 million Agua Nueva Water Reclamation Facility in Tucson, Ariz. The 32-million-gallon-per-day facility produces A+ quality effluent and features state-of-the-art odor control technology. Key challenges were meeting stringent contractual/permit effluent requirements and compliance schedules, coordinating shutdown of the old facility with Agua Nueva startup, maintaining strong coordination with other projects and optimizing capital and life-cycle costs.

 

 

DBIA 2014 Excellence in Teaming – Henry M. Jackson Federal Building Modernization

The Henry M. Jackson Federal Building modernization in Seattle, Wash., served to reduce the building's energy consumption by 30 percent, increase the Energy Star score to 97 and achieve a LEED-EB Silver certification from the USGBC through multiple energy-related scopes. After shortlisting to three firms, cost and schedule were fixed to enable the teams to focus on innovative solutions to energy savings. To ensure accountability, the GSA used a performance guarantee that included one year of monitoring the Energy Use Intensity against goals established by the design-build teams, for which $1.8 million was held as retention.

 

 

DBIA 2014 National Award of Excellence by Category winners are:

• Aviation – The San Diego International Airport Terminal 2 and Airside Expansion, San Diego, Calif.
• Civic – FY11 228 PN UEPH Schofield Barracks, Fort Shafter, Oahu, Hawaii
• Commercial/Office – Wendell August, Grove City, Pa.
• Education – Golisano Institute for Sustainability Research Building, Rochester, N.Y.
• Healthcare – California Health Care Facility Stockton, Stockton, Calif.
• Industrial/Process/Research – Rolls-Royce Advanced Aerofoil Machining Facility, Prince George County, Va.
• Rehabilitation/Renovation/Restoration – Henry M. Jackson Federal Building Modernization, Seattle, Wash.
• Transportation – Denver Union Station Transit Improvements, Denver, Colo.
• Water/Wastewater - Agua Nueva Water Reclamation Facility, Tucson, Ariz.

Related Stories

| Nov 1, 2010

John Pearce: First thing I tell designers: Do your homework!

John Pearce, FAIA, University Architect at Duke University, Durham, N.C., tells BD+C’s Robert Cassidy  about the school’s construction plans and sustainability efforts, how to land work at Duke, and why he’s proceeding with caution when it comes to BIM.

| Nov 1, 2010

Vancouver’s former Olympic Village shoots for Gold

The first tenants of the Millennium Water development in Vancouver, B.C., were Olympic athletes competing in the 2010 Winter Games. Now the former Olympic Village, located on a 17-acre brownfield site, is being transformed into a residential neighborhood targeting LEED ND Gold. The buildings are expected to consume 30-70% less energy than comparable structures.

| Oct 27, 2010

Grid-neutral education complex to serve students, community

MVE Institutional designed the Downtown Educational Complex in Oakland, Calif., to serve as an educational facility, community center, and grid-neutral green building. The 123,000-sf complex, now under construction on a 5.5-acre site in the city’s Lake Merritt neighborhood, will be built in two phases, the first expected to be completed in spring 2012 and the second in fall 2014.

| Oct 21, 2010

GSA confirms new LEED Gold requirement

The General Services Administration has increased its sustainability requirements and now mandates LEED Gold for its projects.

| Oct 18, 2010

World’s first zero-carbon city on track in Abu Dhabi

Masdar City, the world’s only zero-carbon city, is on track to be built in Abu Dhabi, with completion expected as early as 2020. Foster + Partners developed the $22 billion city’s master plan, with Adrian Smith + Gordon Gill Architecture, Aedas, and Lava Architects designing buildings for the project’s first phase, which is on track to be ready for occupancy by 2015.

| Oct 13, 2010

Editorial

The AEC industry shares a widespread obsession with the new. New is fresh. New is youthful. New is cool. But “old” or “slightly used” can be financially profitable and professionally rewarding, too.

| Oct 13, 2010

Test run on the HP Z200 SFF Good Value in a Small Package

Contributing Editor Jeff Yoders tests a new small-form factor, workstation-class desktop in Hewlett-Packard’s line that combines performance of its minitower machine with a smaller chassis and a lower price.

| Oct 13, 2010

Prefab Trailblazer

The $137 million, 12-story, 500,000-sf Miami Valley Hospital cardiac center, Dayton, Ohio, is the first major hospital project in the U.S. to have made extensive use of prefabricated components in its design and construction.

| Oct 13, 2010

Thought Leader

Sundra L. Ryce, President and CEO of SLR Contracting & Service Company, Buffalo, N.Y., talks about her firm’s success in new construction, renovation, CM, and design-build projects for the Navy, Air Force, and Buffalo Public Schools.

boombox1
boombox2
native1

More In Category


Healthcare Facilities

Watch on-demand: Key Trends in the Healthcare Facilities Market for 2024-2025

Join the Building Design+Construction editorial team for this on-demand webinar on key trends, innovations, and opportunities in the $65 billion U.S. healthcare buildings market. A panel of healthcare design and construction experts present their latest projects, trends, innovations, opportunities, and data/research on key healthcare facilities sub-sectors. A 2024-2025 U.S. healthcare facilities market outlook is also presented.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021