flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Demolition danger: Traditional Japanese architecture under threat in Tokyo district

Demolition danger: Traditional Japanese architecture under threat in Tokyo district

Preservation faces a lot of obstacles in this area, from the law to limited urban space for developers.


By BD+C Staff | July 9, 2014
Oddly enough, a tree has become the center of efforts to conserve traditional architecture in Tokyo's historic Yanaka district. The 90-year-old Himalayan cedar stands on a plot purchased by an Osaka-based real estate agent. Residents are trying to block plans to bulldoze the plot as part of an ongoing effort to preserve the neighborhood. 
 
The Yanaka area is unique because it is home to so many buildings which survived both the Great Kanto Earthquake of 1923 and World War II. The cedar plot currently up for bulldozing is surrounded by buildings from the Edo Period (1603–1867), the Taisho Era (1912-1926) and the early Showa Era (1926-1989). The Tokyo University of the Arts performed a survey showing that wooden buildings dating to 1964 or earlier in and around Yanaka have dropped in number from 748 in 1986 to 4016 in 2012. 
 
Read the full story at The Asahi Shimbun.

Tags

Related Stories

Wood | Feb 14, 2019

Gensler designs Texas’ first full mass timber building

The 8,500-sf structure will be located in Fredericksburg.

Wood | Oct 19, 2018

Design revealed for mass-timber residential tower in Milwaukee

The developer is confident that the city will approve construction, which is scheduled to start next year.

Wood | Oct 10, 2018

A recent seminar in New York City talks up the use of mass timber for taller buildings

The products’ future, though, could hinge on approval of proposed code changes.    

Wood | Aug 24, 2018

The largest dowel laminated timber project in North America begins construction in Des Moines

The building will feature a unique “shou sugi ban” charred wood exterior.

Wood | Jul 23, 2018

Mass timber high-rise project on hold in Portland, Ore.

Inflation, escalating construction costs, and fluctuations in tax credit market are to blame for the Framework project being put on hold.

Wood | Jul 2, 2018

Mass timber comes of age: Code consideration, evolving supply chain promise new options for tall wood buildings

Judging by the outcome of a recent International Code Council Action Hearing, it’s likely that we will be seeing more and taller mass timber buildings across the country very soon, writes Patricia Layton, PhD, Professor of Forestry, Clemson University.

Codes and Standards | Jun 19, 2018

Structural engineered wood products exempt from new EPA formaldehyde ruling

Exempt products include structural plywood, oriented strand board (OSB).

| May 30, 2018

Accelerate Live! talk: T3 mass timber office buildings

In this 15-minute talk at BD+C’s Accelerate Live! conference (May 10, 2018, Chicago), architect and mass timber design expert Steve Cavanaugh tells the story behind the nation’s newest—and largest—mass timber building: T3 in Minneapolis.

Multifamily Housing | Apr 23, 2018

Mass timber design for multifamily housing

The adaptability of urban development could be revolutionized through the inherent strength of mass timber construction.

Wood | Feb 15, 2018

Japanese company announces plans for the world’s tallest wooden skyscraper

The planned tower would rise 350 meters (1148 feet).

boombox1
boombox2
native1

More In Category



Mass Timber

British Columbia hospital features mass timber community hall

The Cowichan District Hospital Replacement Project in Duncan, British Columbia, features an expansive community hall featuring mass timber construction. The hall, designed to promote social interaction and connection to give patients, families, and staff a warm and welcoming environment, connects a Diagnostic and Treatment (“D&T”) Block and Inpatient Tower.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021