flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Delicate balance: Needs vs. capital for government agencies

Giants 400

Delicate balance: Needs vs. capital for government agencies

P3s and real estate exchanges help keep some government construction and renovation on track.


By John Caulfield, Senior Editor | October 2, 2017
The FBI’s Biometric Technology Center

The FBI’s Biometric Technology Center is designed to accommodate the future of the Bureau’s largest division, Criminal Justice Information Services. Its modular design enables a flexible and adaptable workplace

The city of Chattanooga, Tenn., has been trying to get a new federal courthouse built for two decades. Its 84-year-old courthouse has been on the General Services Administration’s replacement list since 1999. But a new courthouse, which would cost around $157 million, once again fell just short of making the Federal Judiciary Courthouse Project funding priorities list for 2018.

So it goes for construction projects that are at the mercy of the political and budgetary vagaries of local, state, and federal governments.

Even the news that the Trump Administration’s 2018 budget calls for $200 billion in direct federal infrastructure spending over 10 years has AEC sources wondering whether that budget has any chance of passing, and how much of that money would end up financing nonresidential building and renovation.

Some firms are hopeful. “There is a lot of change occurring in all levels of government, which will create project opportunities,” says Karl Stumpf, AIA, LEED AP BD+C, Government Sector Leader with EYP.

Other firms, not so much. “Our federal healthcare clients know they are unlikely to see the level of capital investment to fulfill their current needs,” says Bill Kline, AIA, EDAC, LEED AP, who leads SmithGroupJJR’s Federal Programs–Healthcare group in Washington, D.C.

He notes that the Department of Veterans Affairs has identified 4,200 capital projects totaling more than $41 billion and 89 future projects totaling $10 billion, but is currently short $15 billion for capital improvements.

 

Seeking alternative funding sources

Public nonresidential construction spending was down in Q1/2017, according to Census Bureau estimates. But the value of construction put in place in March was still a seasonally adjusted $278 billion, evidence that governments are more selectively building, replacing, and improving
their inventories.

EYP’s Stumpf says all levels of government are still interested in investing in office projects that result in better space utilization and lower operating costs.

In May, the city of Gainesville, Fla., broke ground on a new 24,000-sf fire station, designed by Bentley Architects + Engineers. Gilbane Building Co. is serving as the CM at risk on this project, which comes on the heels of another fire station, administration, and headquarters facility that Gilbane recently completed for the city of Fort Myers, Fla.

But the inescapable fact is that local, county, and state governments are strapped for cash, or limited by balanced-budget mandates, to where “we’re not seeing public building projects, such as police and fire departments, municipal office buildings, courthouses, libraries, and community centers advancing quickly enough to meet community needs,” says Joseph Ruocco, AIA, Associate Director and Senior Project Manager with Skidmore, Owings & Merrill.

 

The U.S. Consulate in Erbil, in Iraq’s Kurdistan regionThe U.S. Consulate in Erbil, in Iraq’s Kurdistan region, will be the largest such facility in the world. Designer EYP is seeking to create a community whose features are familiar to Americans while also connecting to local culture. Rendering EYP.

 

Agencies at all levels are seeking to uncover new ways to get projects moving. The GSA now selectively employs a “real estate transaction exchange” with potential developers, where the agency offers land and development rights to a developer that provides a building designed to the agency’s specifications on a separate parcel. The developer gets the existing building that is being replaced and the land it’s sitting on, which it can use for future development.

Ruocco also notes that local, county, and state governments are more receptive to the design-build-finance-operate-maintain public-private partnership model, applied over a time frame that can extend 40 years.

At the federal level, SOM is finding that government agencies—such as the State Department’s Overseas Building Operations, the GSA, the Army Corps of Engineers, and the Naval Facilities Engineering Command—have successfully secured project funding over the past few years.

SOM has worked with OBO on new designs for missions in China. Last year, GSA secured congressional approval of nearly $947 million for its Federal Courthouse Program. Funding has been approved for new courthouses in Harrisburg, Pa., Huntsville, Ala., and Fort Lauderdale, Fla., to start building next year.

In St. Louis, the National Geospatial-Intelligence Agency West, a $1.75 billion, 800,000-sf facility, is slated to start construction next year, with completion scheduled for late 2022. Ruocco says this is one of the largest-scale projects to be issued since the Department of Defense’s 2005 Base Realignment and Closure Commission program in 2005.

 

Also See: BD+C Giants 300 government rankings

Top 95 government architecture firms

Top 55 government engineering firms

Top 85 government construction fimrs

 

SmithGroupJJR has established a relationship with the Department of Defense’s National Intrepid Center of Excellence (NICoE), a research, diagnostic, and treatment center for soldiers with traumatic brain injuries and post-traumatic stress, whose main facility is the Walter Reed National Military Medical Center, Bethesda, Md.

Arnold Fisher, Chairman of the Intrepid Fallen Heroes Fund, which led the initial fundraising drive for NICoE, has commissioned SmithGroupJJR to design template satellite centers for nine military bases, whose construction will be financed by the Intrepid Fallen Heroes Fund and gifted to the government upon completion.

The firm will complete the sixth of nine satellites this fall, at the Joint Base Lewis McCord, Tacoma, Wash., and has the seventh under construction at Camp Pendleton, in San Diego.

 

A fraught supply-chain ruling

Governments’ real estate holdings are vast, and its need to renovate and replenish its building stock will always present opportunities to AEC firms. Ruocco notes that many 1970s-era urban renewal projects are approaching their 50-year shelf life. “It’s time for their modernization or replacement,” he says.

But projects are more complicated today than they were a few generations ago. One potential game changer, says Kline, could be the fallout from a recent Supreme Court decision, Kingdomware Technologies, Inc. v. United States, which regards the implementation of set-aside requirements for veteran-owned small businesses under Federal Supply Schedule contracts.

The Court ruled that if two qualified disabled veteran-owned firms are available, the VA must contract with them over any other firm. That ruling, says Kline, will, at the very least “change the strategy architects and engineers use when competing for VA work.”

 

SEE ALL 2017 GIANTS 300 RANKINGS

Related Stories

| Nov 13, 2013

Installed capacity of geothermal heat pumps to grow by 150% by 2020, says study

The worldwide installed capacity of GHP systems will reach 127.4 gigawatts-thermal over the next seven years, growth of nearly 150%, according to a recent report from Navigant Research.

| Nov 8, 2013

Oversized healthcare: How did we get here and how do we right-size?

Healthcare facilities, especially our nation's hospitals, have steadily become larger over the past couple of decades. The growth has occurred despite stabilization, and in some markets, a decline in inpatient utilization.

| Nov 8, 2013

S+T buildings embrace 'no excuses' approach to green labs

Some science-design experts once believed high levels of sustainability would be possible only for low-intensity labs in temperate zones. But recent projects prove otherwise. 

| Nov 6, 2013

PECI tests New Buildings Institute’s plug load energy use metrics at HQ

Earlier this year, PECI used the NBI metrics to assess plug load energy use at PECI headquarters in downtown Portland, Ore. The study, which informed an energy-saving campaign, resulted in an 18 percent kWh reduction of PECI’s plug load.

| Oct 30, 2013

15 stellar historic preservation, adaptive reuse, and renovation projects

The winners of the 2013 Reconstruction Awards showcase the best work of distinguished Building Teams, encompassing historic preservation, adaptive reuse, and renovations and additions.

| Oct 30, 2013

Why are companies forcing people back to the office?

For a while now companies have been advised that flexibility is a key component to a successful workplace strategy, with remote working being a big consideration. But some argue that we’ve moved the needle too far toward a “work anywhere” culture. 

| Oct 30, 2013

11 hot BIM/VDC topics for 2013

If you like to geek out on building information modeling and virtual design and construction, you should enjoy this overview of the top BIM/VDC topics.

| Oct 28, 2013

Urban growth doesn’t have to destroy nature—it can work with it

Our collective desire to live in cities has never been stronger. According to the World Health Organization, 60% of the world’s population will live in a city by 2030. As urban populations swell, what people demand from their cities is evolving.

| Oct 18, 2013

Researchers discover tension-fusing properties of metal

When a group of MIT researchers recently discovered that stress can cause metal alloy to fuse rather than break apart, they assumed it must be a mistake. It wasn't. The surprising finding could lead to self-healing materials that repair early damage before it has a chance to spread. 

| Oct 18, 2013

Sustainability expert: Smart building technology can have quick payback

Smart building technology investments typically pay for themselves within one or two years by delivering energy savings and maintenance efficiencies.

boombox1
boombox2
native1

More In Category



Laboratories

The Department of Energy breaks ground on the Princeton Plasma Innovation Center

In Princeton, N.J., the U.S. Department of Energy’s Princeton Plasma Physics Laboratory (PPPL) has broken ground on the Princeton Plasma Innovation Center (PPIC), a state-of-the-art office and laboratory building. Designed and constructed by SmithGroup, the $109.7 million facility will provide space for research supporting PPPL’s expanded mission into microelectronics, quantum sensors and devices, and sustainability sciences. 


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021