flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Deadline nears on New York City sprinkler requirement for tall office buildings

Codes and Standards

Deadline nears on New York City sprinkler requirement for tall office buildings

The mandate applies to all buildings regardless of when constructed.


By Peter Fabris, Contributing Editor | April 12, 2019
Deadline nears on New York City sprinkler requirement for tall office buildings

Photo: Pixabay

In the aftermath of the 9/11 terrorist attacks, New York City enacted a requirement that all office buildings 100 feet tall or taller install sprinkler systems.

The deadline for meeting that code mandate is this July 1. Building owners must submit a final report on the sprinkler system by an engineer or architect by that date. The deadline is not for receiving approval from the city, says Daniel Colombini, principal and director of plumbing and fire protection engineering, Goldman Copeland.

“It’s important to allow time for the engineer or architect to inspect the building and for the building contractor, before that, to close out the building department application,” Colombini says. “It can take a month or more for the contractor to complete that process.”

Some spaces that were exempt under older codes, such as bathrooms and mechanical rooms, are now covered. “It’s essential to ensure that all such spaces are now sprinklered,” he adds. Extension requests are no longer being accepted by the city, and there is no process for appeal.

 

Related Stories

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Codes and Standards | Aug 30, 2017

Trump rescinds elevation requirements for federally funded buildings and infrastructure

Flood protection on subsidized housing, hospitals, and other public buildings rolled back.

Codes and Standards | Aug 30, 2017

Stormwater runoff mitigation pays off for some building owners

Rain gardens, green roofs, cisterns, and rainwater recycling add value.

Codes and Standards | Aug 28, 2017

Commercial properties address state carbon-reduction policies

EV charging stations, batteries, and microgrid technology are all part of effort to meet demand for cleaner power.

Codes and Standards | Aug 24, 2017

OSHA silica dust exposure enforcement begins Sept. 23

Vacuum dust collection, water-delivery systems, and respirators will be required.

Codes and Standards | Aug 18, 2017

Cool roofs may increase air pollution

California’s requirement for cool roofs on new non-residential buildings could promote smog.

Codes and Standards | Aug 17, 2017

Black market sales of OSHA training certifications plague New York City construction industry

Task force formed to get fake training cards off the streets and workers properly trained.

Codes and Standards | Aug 16, 2017

Big changes coming to Ontario building code

Proposals include solar-ready roofs, more stringent heating/cooling efficiency requirements, and graywater reuse.

Codes and Standards | Aug 14, 2017

New edition of AISC Steel Construction Manual now available

Includes the 2016 Specification for Structural Steel Buildings.

boombox1
boombox2
native1

More In Category


Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021