flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Deadline extension for LEED 2009 project certifications

Codes and Standards

Deadline extension for LEED 2009 project certifications

Delivery timeline delays due to COVID-19 pandemic prompt action.


By Peter Fabris, Contributing Editor | October 1, 2020

Courtesy Pixabay

USGBC and GBCI are extending the LEED v3 certification deadline from June 30, 2021 to June 30, 2022.

The additional year to submit for review is aimed at easing the burden of COVID-19 pandemic project schedule delays. LEED v3 includes all LEED 2009 rating systems.

LEED 2009 is currently closed for registration, but open for certification. To move to the newest versions of the rating system, LEED v4 and LEED v4.1, ahead, USGBC closed registration under LEED 2009 in October 2016.

“In addition to having more time to complete LEED 2009 certification projects, project teams also have the option to upgrade to LEED v4 or LEED v4.1 with no additional fees,” according to a USGBC news release. “Our expert team will guide any projects that choose to make this switch with one-on-one support.”

Related Stories

Codes and Standards | Mar 3, 2021

Texas freeze raises questions about risks of electrifying buildings

Gas stoves helped residents cook, boil water when power went out.

Codes and Standards | Mar 2, 2021

New Seattle building code eliminates fossil fuels for most space and water heating

Also increases on-site solar photovoltaics, reduces envelope heat loss, air leakage, and interior lighting power allowances.

Codes and Standards | Feb 25, 2021

It’s not just lumber—roofing material prices are also on the rise

Lower demand for petroleum products means less asphalt production.

Codes and Standards | Feb 23, 2021

ASHRAE Epidemic Task Force releases updated Building Readiness Guide

Includes flush calculations to reduce time and energy to clear contaminants between occupancy periods.

Codes and Standards | Feb 22, 2021

Preservation of Affordable Housing develops climate resilience strategy

Includes backup power for resident and staff “area of refuge”.

Codes and Standards | Feb 18, 2021

Construction industry moves toward comprehensive U.S. BIM standard

NIBS hosts roundtable to create coordinated program to advance collaboration.

Codes and Standards | Feb 17, 2021

Construction on international sports venues is ripe for corruption

Poor planning, complex contracting, a lack of accountability and high levels of collusion to blame.

Codes and Standards | Feb 16, 2021

Feds may fund removal of some urban highways

Senate bill proposes pilot program to reknit communities.

Codes and Standards | Feb 16, 2021

Bechtel joins international heat resilience organization

Experience designing resilience standards to aid effort to protect communities from extreme heat.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021