Frank Gehry's updated design for a new Dwight D. Eisenhower memorial in Washington, D.C., has been approved by the Eisenhower Memorial Commission, reports the Washington Post.
The commission voted unanimously to approve the $110 million project, which has been gestating for 14 years and has been the subject of a fair amount of controversy, including vocal objections by some members of the Eisenhower family. The memorial will be built across the street from the National Air and Space Museum, a few blocks from the U.S. Capitol.
To win the commission's approval, Gehry tweaked the design of statues depicting Eisenhower as a young man, a World War II general, and president. A bas relief that had been removed from the design was restored, and excerpts from Eisenhower's celebrated Guildhall Address—delivered in the wake of the allied victory in Europe—will also be included.General P.X. Kelley, who chairs the commission's advisory board and who helped oversee development of the Korean and WWII memorials, called the updated design "spectacular."
Gehry offered prepared remarks before the commission, saying he has "spent the last four years immersed in Eisenhower's words, and the words of those who have shaped how history will define him." The architect said that new imagery, including the D-Day landing at Normandy and Eisenhower signing the Civil Rights Act of 1957, was added in part to respond to concerns by family members and other critics.
Related Stories
| May 10, 2012
Chapter 4 Business Case for High-Performance Reconstructed Buildings
Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.
| May 10, 2012
Chapter 3 How Building Technologies Contribute to Reconstruction Advances
Building Teams are employing a wide variety of components and systems in their reconstruction projects.
| May 10, 2012
Chapter 2 Exemplary High-Performance Reconstruction Projects
Several case studies show how to successfully renovate existing structures into high-performance buildings.
| May 9, 2012
Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings
As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.
| May 9, 2012
International green building speaker to keynote Australia’s largest building systems trade show
Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.
| May 9, 2012
Tishman delivers Revel six weeks early
Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.
| May 9, 2012
Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award
Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.
| May 9, 2012
Shepley Bulfinch given IIDA Design award for Woodruff Library?
The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.
| May 9, 2012
Construction Defect Symposium will examine strategies for reducing litigation costs
July event in Key West will target decision makers in the insurance and construction industries.
| May 8, 2012
WDMA and AAMA release window, door & skylight market studies
Historic data for 2006 through 2011 and forecast data for 2012 through 2015 are included in the report.