flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

DBIA disputes study claiming design-build projects often delivered on time, over budget

Building Team

DBIA disputes study claiming design-build projects often delivered on time, over budget

Says study did not account for owner-initiated scope changes.


By Peter Fabris, Contributing Editor | February 10, 2016
DBIA disputes study claiming design-build projects often delivered on time, over budget

Photo: Atomische * Tom Giebel/Creative Commons

The Journal of Engineering and Construction Management recently published a study that found the design-build delivery method in construction contracting results in a majority of on-time projects, but half of projects using that method run over budget. 

The study said that the perception of design-build’s cost savings advantage was uncertain. Researchers in China and Australia studied 418 projects in the Design-Build Institute of America database and found that although half of them resulted in cost overruns, and 75% were completed on time or ahead of schedule.

The Design-Build Institute of America responded to the study results and asserted that the researchers are off the mark, saying that they did not account for possible additional costs resulting from owner-initiated scope changes.

Related Stories

BIM and Information Technology | Sep 14, 2015

Is Apple's new iPad Pro a game changer for architects?

A stylus, split screen, and improved graphics make designing on the tablet easier.

Sponsored | Building Team | Aug 25, 2015

9 characteristics that distinguish leading A/E firms

By analyzing the “benchmark firms” selected from its annual surveys, PSMJ has identified several characteristics that distinguish top performers

Office Buildings | Aug 24, 2015

British company OpenDesk offers open-sourced office furniture

Offices can “download” their furniture to be made locally, anywhere.

Sponsored | BIM and Information Technology | Aug 20, 2015

Part II - Will BIM Work as a Deliverable? A Legal Perspective on BIM

Having the right counsel on your team can be the difference between long drawn-out negotiations and breaking new ground to meet the owner’s needs.

Sponsored | Building Team | Aug 20, 2015

Understanding the values and aspirations of millennials

A recent LinkedIn workplace survey revealed that millennials (defined as individuals aged 18–24) are quite different from boomers (those aged 55–65)

BIM and Information Technology | Aug 17, 2015

Reimagined cursors can change digital imaging

A University of Montreal professor has developed a system that elevates 2D cursors for a 3D world.

Building Team | Aug 17, 2015

One female contractor gets vocal about urging women to consider construction as a career

Doreen DiPolito of Florida’s D-Mar General Contracting thinks opportunities abound in an industry struggling with worker shortages.

Sponsored | Building Team | Aug 11, 2015

How to improve project planning

A recent research project revealed that more than 75 percent of project owners have no consistent method for assessing project risks and setting budget contingencies. 

Retail Centers | Jul 27, 2015

Fish-shaped shopping mall designed for odd plot of land in China

The mall, in Qinshui, a city in China’s Shanxi province, will fit within the 250x30-meter dimensions surrounded by parallel roads and two converging rivers. 

Airports | Jul 22, 2015

MUST SEE: JFK airport taps Gensler to design terminal for animals

Pets can enjoy luxurious spa and grooming services before being transported directly to their flight from the terminal.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021