The City of Davis, Calif., has initiated environmental impact studies on two projects that, if approved, would add nearly 7 million sf of commercial space to this market.
The Sacramento Business Journal reports that the city expects to complete those studies by next summer, after which it could take another 18 to 24 months to annex the land needed for two “innovation centers” for local research and technology companies.
The Business Journal reports that there are two proposals on the table:
• The Mace Ranch Innovation Center, submitted by The Buzz Oates Group of Companies, Ramco Enterprises and Barbara Bruner, would add office, research, retail and hotel space on 212 acres east of the city;
• The Davis Innovation Center, proposed by Hines, a real estate firm, and SKS Development, would place as much as 4 million sf of office space on 208 acres northeast of the city.
A third proposal for as 200-acre project called Davis Ranch—by Capitol Corridor Ventures, AKT Investments, Panattoni Development, and land entitlement expert George Philips—has yet to submit drawings to the city.
The annexation requires a majority vote by the public, which over the past decade rejected two large residential subdivisions. The projects would also need approval by the city’s Council, Yolo County, and the Local Agency Formation Commission.
Related Stories
| Oct 30, 2012
Two-hour fire rated curtain wall passes CDC tests
CDC (Curtain Wall Design and Consulting) is an independent firm providing a wide range of building envelope design, engineering, and consulting services to design professionals nationwide.
| Oct 30, 2012
Wight & Company announces three hires
Expands team and adds staff to work on the UNO project.
| Oct 15, 2012
Silicones from Dow Corning solve high-altitude technical challenges at the world’s tallest tower
The spectacular Burj Khalifa skyscraper soars to 828m above ground level, holding the record for being the world’s tallest building and also for the highest installation of an aluminum and glass façade. To take on its numerous challenges and technical difficulties, it required proven silicone solutions and full support from Dow Corning.
| Oct 15, 2012
Three new members elected to AISC Board of Directors
New members will immediately begin serving on the AISC Board of Directors, assisting with the organization's planning and leadership in the steel construction industry.
| Oct 11, 2012
Hank Adams Named to Lead HDR’s Healthcare Program
With more than 25 years of experience, HDR vice president is tapped to lead firm's healthcare projects.
| Oct 10, 2012
Foster + Partners to Design New 425 Park Avenue Tower
Conceptual designs submitted by Foster, Hadid, Koolhaas and Rogers to be on exhibit during Municipal Art Society’s Annual Symposium
| Oct 9, 2012
AIA billings index sounds a positive note
The so-called new projects index was at a relatively healthy 57.2, up from 56.3 the previous month.
| Oct 9, 2012
Celebrating brick in architecture
The Brick Industry Association’s 2012 Brick in Architecture Awards put the spotlight on new projects that make creative use of one of humankind’s oldest and most beloved building materials.
| Oct 5, 2012
2012 Reconstruction Award Special Recognition: Joplin Interim High School, Joplin, Mo.
At 5:41 p.m. CDT on Sunday, May 22, 2011, an EF5 tornado touched down in Joplin, Mo. In the next 31 minutes, the mile-wide, multiple-vortex tornado, with winds up to 250 mph, destroyed two thousand buildings, including Joplin High and nine other schools.
| Oct 5, 2012
2012 Reconstruction Award Bronze Winner: DPR Construction, Phoenix Regional Office, Phoenix, Ariz.
Working with A/E firm SmithGroupJJR, DPR converted a vacant 16,533-sf one-time “adult-themed boutique” in the city’s reemerging Discovery Triangle into a LEED-NC Platinum office, one that is on target to be the first net-zero commercial office building in Arizona.