The City of Davis, Calif., has initiated environmental impact studies on two projects that, if approved, would add nearly 7 million sf of commercial space to this market.
The Sacramento Business Journal reports that the city expects to complete those studies by next summer, after which it could take another 18 to 24 months to annex the land needed for two “innovation centers” for local research and technology companies.
The Business Journal reports that there are two proposals on the table:
• The Mace Ranch Innovation Center, submitted by The Buzz Oates Group of Companies, Ramco Enterprises and Barbara Bruner, would add office, research, retail and hotel space on 212 acres east of the city;
• The Davis Innovation Center, proposed by Hines, a real estate firm, and SKS Development, would place as much as 4 million sf of office space on 208 acres northeast of the city.
A third proposal for as 200-acre project called Davis Ranch—by Capitol Corridor Ventures, AKT Investments, Panattoni Development, and land entitlement expert George Philips—has yet to submit drawings to the city.
The annexation requires a majority vote by the public, which over the past decade rejected two large residential subdivisions. The projects would also need approval by the city’s Council, Yolo County, and the Local Agency Formation Commission.
Related Stories
| Aug 12, 2014
Design firms invited to submit qualifications for St. Petersburg, Fla., waterfront project
The city of St. Petersburg, Fla., invites firms to submit their ideas for a new and improved pier for Florida's fifth largest city.
| Aug 11, 2014
Air Terminal Sector Giants: Morphing TSA procedures shape terminal design [2014 Giants 300 Report]
The recent evolution of airport terminals has been prompted largely by different patterns of passenger behavior in a post-9/11 world, according to BD+C's 2014 Giants 300 Report.
| Aug 11, 2014
The Endless City: Skyscraper concept connects all floors with dual ramps
Rather than superimposing one floor on top of another, London-based SURE Architecture proposes two endless ramps, rising gradually with a low gradient from the ground floor to the sky.
| Aug 11, 2014
Will Alsop's funky 'high-rise on stilts' will be built over an apartment building in London
South London's riverfront will soon be graced by one of Will Alsop's eccentric designs: a curved apartment tower on purple stilts.
| Aug 11, 2014
New guide for prevention of thermal bridging in commercial buildings
The guide aims to overcome obstacles with respect to mitigating thermal bridging to reduce energy consumption in buildings.
| Aug 8, 2014
LEGO launches set aimed at professional architects
LEGO Architecture Studio is made up of 76 unique elements and over 1,200 pieces, and is intended to give the builder as much freedom as possible.
| Aug 8, 2014
First look: China's latest office development will take the shape of binary code
The Window of Guangzhou project will consist of three towers forming the number sequence "001."
| Aug 8, 2014
Government Sector Giants: Public-sector construction slow, but stirring [2014 Giants 300 Report]
Improving energy performance of existing properties through targeted upgrades and large-scale reconstruction continues to be a federal priority, according to BD+C's 2014 Giants 300 Report.
Sponsored | | Aug 8, 2014
Setting guidelines for construction PDF documents across the AEC industry
Sasha Reed interviews two members of the coalition responsible for creating new Guidelines for Construction PDF Documents. SPONSORED CONTENT
Sponsored | | Aug 8, 2014
Safe and secure: Fire and security glazing solution for Plaquemines Parish Detention Center
When the designers at L. R. Kimball looked for an all-in-one clear, wire-free glazing solution that protects against fire, bullets and forced entry for the new Plaquemines Parish Detention Center, SAFTI FIRST supplied a complete single-source tested and listed assembly that was easy to install and maintenance-free.