flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

Mixed-Use

David Chipperfield Architects to design Schützenstraße mixed-use development in Munich

The firm recently won a competition for the project.


By David Malone, Managing Editor | February 9, 2022
Schützenstraße
Renderings Filippo Bolognese Images

David Chipperfield Architects Berlin has recently won a competition for the development of Schützenstraße, a mixed-use complex in the heart of Munich. The project will sit between Munich’s main railway station and the central square Karlsplatz, creating a lively urban atmosphere through its functional diversity and public green spaces.

The design combines the mediaeval small-scale urban structure of the surrounding areas and the scale of the former imperial capital into one metropolitan structure. The permeable ground floor will be a pillared hall with a visible structure made of recycled concrete that connects Prielmayerstraße and Schützenstraße streets via two passages. On both streets, arcades will invite passers-by to visit the building with its diverse public program at ground level, including cultural facilities, shops, cafes, and restaurants.

David Chipperfield's winning proposal

Green spaces with seating areas will open up to the street space to give structure and scale to the building complex. Building volumes of varying scales will become smaller towards the top and are situated above the ground floor. In between these volumes leafy terraces and an intensively planted, publicly accessible roof scape will provide external spaces on several levels. Office areas on the upper floors are planned as a timber hybrid construction, wrapped in a facade of green anodized aluminum profiles.

The competition winning design was developed in collaboration with landscape architect Atelier Loidl Landschaftsarchitekten and was selected from a total of eleven entries.

David Chipperfield winning proposal

Tags

Related Stories

Mixed-Use | Mar 1, 2017

New hotel and residential tower coming to San Francisco’s Transbay neighborhood

The ground-up development will feature 255 hotel rooms and 69 residential units.

Mixed-Use | Feb 27, 2017

Tallest tower in Miami to begin construction in January 2019

The tower will reach a height of 1,049 feet, the maximum height permitted by the FAA in Miami.

Mixed-Use | Feb 23, 2017

5-tower scheme revealed for Zhengzhou, China

The towers will vary in height and emerge from a shared retail podium.

Mixed-Use | Feb 22, 2017

Hunt Development Group selected to spearhead Cabrini-Green redevelopment

The Chicago Housing Authority selected the firm to develop mixed-income housing and retail space where the infamous housing project once stood.

Mixed-Use | Feb 21, 2017

Coconut Grove’s newest mixed-use development springs from a converted parking garage

Terra says the development will be the first newly built office building in central Coconut Grove in over 20 years.

High-rise Construction | Feb 17, 2017

Zaha Hadid Architects-designed building to have the world’s tallest atrium

A 190-meter atrium will rise the full height of the building between two twisting sections.

Mixed-Use | Feb 8, 2017

Santiago Calatrava’s first major UK project will be the heart of the Greenwich Peninsula transformation

Peninsula Place will cost £1 billion and act as a gateway to the new, master-planned district.

Mixed-Use | Feb 7, 2017

Traditional Arab architecture and the surrounding mountainous terrain inspire a luxury hotel in Mecca

The Foster + Partners-designed building will address the shortage of accommodation in Mecca.

High-rise Construction | Jan 26, 2017

Paris tower provides office space and three hotel complexes across its three superimposed volumes

Equipped with hanging gardens and a panoramic viewpoint for its top tier, Jardins de l’Arche Tower will rise in Paris’s La défense business district.

Mixed-Use | Jan 26, 2017

New renderings provide glimpse into large mixed-use project, Circa

The $500 million complex will begin pre-leasing in winter, 2017 and open for move-in early in 2018. 

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021