The American Institute of Architects (AIA) inaugurated Dan Hart, FAIA, as its 98th president on Friday, Dec. 10.
“I’m spectacularly optimistic,” said Hart. “As I consider this moment in AIA’s deep history and the complexity that all of us together represent, I see beauty on the other side. I believe we are at a pivotal moment. As we move from aspiration to agency on our core dual strategies of addressing climate and justice through the built environment … we stand together and are prepared to take action.”
Hart has held a number of AIA leadership positions. He was the moderator of the AIA Strategic Council in 2016 and served on the AIA National Board of Directors. While on the board, he chaired the AIA Board Knowledge Committee and AIA Public Outreach Committee as well as co-chaired the AIA COVID-19 Business Task Force. He also served as president of the Texas Society of Architects in 2011.
After more than three decades as a practicing architect and engineer, Hart is a principal and executive vice president of architecture at Parkhill—a 450-person architecture and engineering firm headquartered in Texas—and serves on the firm’s board of directors. He has experience designing religious and educational buildings and has master-planned a variety of campuses.
Hart was also adjunct instructor for four years for senior-level architecture students at Texas Tech University, where he was the distinguished alumnus of the College of Architecture in 2017 and was the founding president of the college’s Design Leadership Alliance. Additionally, he was a trustee on the board of Schreiner University.
Hart earned a Bachelor of Architecture/Bachelor of Science, Civil Engineering from Texas Tech University. In 2014, he was elevated to AIA fellowship.
AIA elects its presidents on an annual basis. Hart will serve as the Institute’s president until Dec. 9, 2022. Complete details of AIA’s leadership are available online.
Related Stories
| Apr 9, 2013
FMI predicts 8% rise in construction put in place for 2013
FMI, the largest provider of management consulting and investment banking services to the engineering and construction industry released today its Q1-2013 Construction Outlook. The forecast for total construction-put-in-place for 2013 continues to show an increase of 8% over 2012 levels.
| Apr 8, 2013
Most daylight harvesting schemes fall short of performance goals, says study
Analysis of daylighting control systems in 20 office and public spaces shows that while the automatic daylighting harvesting schemes are helping to reduce lighting energy, most are not achieving optimal performance, according to a new study by the Energy Center of Wisconsin.
| Apr 6, 2013
Lord, Aeck & Sargent and Urban Collage merge
In a move that brings full-service planning expertise to its already well-established architecture practice, Lord, Aeck & Sargent (LAS) has merged with Urban Collage (UC), one of the largest urban and campus planning and design firms in the Southeast. Combining these firms’ talents was made official today. UC plans to retain its name for the foreseeable future.
| Apr 6, 2013
First look: GlaxoSmithKline's double LEED Platinum office
GlaxoSmithKline and Liberty Property Trust/Synterra Partners transform the work environment with the opening of Five Crescent Drive
| Apr 5, 2013
Bangkok gets a leaning tower, that may topple
A seven-story apartment tower under construction in Bangkok has started to tilt and is on the verge of toppling.
| Apr 5, 2013
Snøhetta design creates groundbreaking high-tech library for NCSU
The new Hunt Library at North Carolina State University, Raleigh, incorporates advanced building features, including a five-story robotic bookBot automatic retrieval system that holds 2 million volumes in reduced space.
| Apr 5, 2013
'My BIM journey' – 6 lessons from a BIM/VDC expert
Gensler's Jared Krieger offers important tips and advice for managing complex BIM/VDC-driven projects.
| Apr 5, 2013
Commercial greenhouse will top new Whole Foods store in Brooklyn
Whole Foods and partner Gotham Greens will create a 20,000-sf greenhouse atop one of the retailer's Brooklyn supermarkets. Expected to open this fall, the facility will supply produce to nine Whole Foods stores in metro New York City.
| Apr 5, 2013
Projected cost for Apple's Campus 2 balloons to $5 billion
Campus 2, Apple Inc.'s proposed ring-shaped office facility in Cupertino, Calif., could cost $5 billion to build, according to a report by Bloomberg.
| Apr 5, 2013
Extreme LEGO: Wondrous micro city built out of 200,000 blocks
Master LEGO builder Mike Doyle unveils his latest creation, an out-of-this-world micro city that celebrates peaceful alien contact.