The American Institute of Architects (AIA) inaugurated Dan Hart, FAIA, as its 98th president on Friday, Dec. 10.
“I’m spectacularly optimistic,” said Hart. “As I consider this moment in AIA’s deep history and the complexity that all of us together represent, I see beauty on the other side. I believe we are at a pivotal moment. As we move from aspiration to agency on our core dual strategies of addressing climate and justice through the built environment … we stand together and are prepared to take action.”
Hart has held a number of AIA leadership positions. He was the moderator of the AIA Strategic Council in 2016 and served on the AIA National Board of Directors. While on the board, he chaired the AIA Board Knowledge Committee and AIA Public Outreach Committee as well as co-chaired the AIA COVID-19 Business Task Force. He also served as president of the Texas Society of Architects in 2011.
After more than three decades as a practicing architect and engineer, Hart is a principal and executive vice president of architecture at Parkhill—a 450-person architecture and engineering firm headquartered in Texas—and serves on the firm’s board of directors. He has experience designing religious and educational buildings and has master-planned a variety of campuses.
Hart was also adjunct instructor for four years for senior-level architecture students at Texas Tech University, where he was the distinguished alumnus of the College of Architecture in 2017 and was the founding president of the college’s Design Leadership Alliance. Additionally, he was a trustee on the board of Schreiner University.
Hart earned a Bachelor of Architecture/Bachelor of Science, Civil Engineering from Texas Tech University. In 2014, he was elevated to AIA fellowship.
AIA elects its presidents on an annual basis. Hart will serve as the Institute’s president until Dec. 9, 2022. Complete details of AIA’s leadership are available online.
Related Stories
Sponsored | BIM and Information Technology | Mar 3, 2015
The great debate: Is 3D PDF really BIM?
You can pull apart buildings, cut through floors, and view simulated animation for assembly instructions all within a PDF.
K-12 Schools | Mar 2, 2015
BD+C special report: What it takes to build 21st-century schools
How the latest design, construction, and teaching concepts are being implemented in the next generation of America’s schools.
Codes and Standards | Mar 2, 2015
Proposed energy standard for data centers, telecom buildings open for public comment
The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.
K-12 Schools | Mar 1, 2015
Are energy management systems too complex for school facility staffs?
When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.
Office Buildings | Mar 1, 2015
Google unveils dramatic tent-like, modular-focused plan for corporate HQ
The master plan by Bjarke Ingels and Thomas Heatherwick will wrap highly flexible office blocks in soaring translucent canopies.
Industrial Facilities | Feb 27, 2015
Massive windmill will double as mixed-use entertainment tower in Rotterdam
The 571-foot structure will house apartments, a hotel, restaurants, even a roller coaster.
Architects | Feb 27, 2015
5 finalists announced for 2015 Mies van der Rohe Award
Bjarke Ingels' Danish Maritime Museum and the Ravensburg Art Museum by Lederer Ragnarsdóttir Oei are among the five projects vying for the award.
Office Buildings | Feb 26, 2015
Using active design techniques to strengthen the corporate workplace and enhance employee wellness
The new Lentz Public Health Center in Nashville, Tenn., serves as a model of how those progressive and healthy changes can be made.
K-12 Schools | Feb 26, 2015
Should your next school project include a safe room?
Many school districts continue to resist mandating the inclusion of safe rooms or storm shelters in new and existing buildings. But that may be changing.
K-12 Schools | Feb 26, 2015
Construction funding still scarce for many school districts
Many districts are struggling to have new construction and renovation keep pace with student population growth.