flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

C.W. Driver completes Rec Center on CSUN campus

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.


By By BD+C Staff | April 11, 2012
C.W. Driver utilized a variety of sustainable building practices during construc
C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the centers LEED Gold cer

C.W. Driver completed construction on the new, 118,000-sf Student Recreation Center at California State University, Northridge, (CSUN) in Northridge, Calif.

Located centrally on campus and designed to LEED Gold standards by Irvine-based LPA, Inc., the Student Recreation Center, which opened in January 2012, will serve as a campus gathering place and as a recruitment tool for prospective students.

The two-story complex incorporates a three-court gymnasium, a multi-activity-court, and an 18,500-sf weight and fitness space, among other cutting-edge exercise equipment and amenities. On the eastern portion of the structure, C.W. Driver erected a glass façade, which acts as a “human billboard” to advertise activities to the neighboring community.

C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the center’s LEED Gold certification, such as the use of recycled materials, green roof and cool roof systems, and photovoltaic panels to optimize energy performance. Much of the complex’s exterior consists of glass and the lighting system is enhanced by solatubes, allowing 90 percent of the center to benefit from natural light.

Additionally, solar panels installed on the roof and a ventilation system that moves air naturally through the building contribute to the building’s energy conservation. BD+C

Related Stories

| May 25, 2011

Low Impact Development: Managing Stormwater Runoff

Earn 1.0 AIA/CES HSW/SD learning units by studying this article and successfully passing the online exam.

| May 25, 2011

Register today for BD+C’s June 8th webinar on restoration and reconstruction projects

Based on new and award-winning building projects, this webinar presents our “expert faculty” to examine the key issues affecting project owners, designers and contractors in case studies ranging from gut renovations and adaptive reuses to restorations and retrofits.

| May 25, 2011

Hotel offers water beds on a grand scale

A semi-submerged resort hotel is the newest project from Giancarlo Zema, a Rome-based architect known for his organic maritime designs. The hotel spans one kilometer and has both land and sea portions.

| May 25, 2011

Smithsonian building $45 million green lab

Thanks to a $45 million federal appropriation to the Smithsonian Institution, the Smithsonian Environmental Research Center in Edgewater, Md., has broken ground on what is expected to be one of the most energy-efficient laboratories in the country. The 69,000-sf lab is targeting LEED Gold and is expected to use 37% less energy and emit 37% less carbon dioxide than a similar building.

boombox1
boombox2
native1

More In Category


Retail Centers

Thinking outside the big box (store)

For over a decade now, the talk of the mall industry has been largely focused on what developers can do to fill the voids left by a steady number of big box store closures. But what do you do when big box tenants stay put?


Government Buildings

OSHA’s proposed heat standard published in Federal Register

The Occupational Safety and Health Administration (OSHA) has published a proposed standard addressing heat illness in outdoor and indoor settings in the Federal Register. The proposed rule would require employers to evaluate workplaces and implement controls to mitigate exposure to heat through engineering and administrative controls, training, effective communication, and other measures.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021