C.W. Driver completed construction on the new, 118,000-sf Student Recreation Center at California State University, Northridge, (CSUN) in Northridge, Calif.
Located centrally on campus and designed to LEED Gold standards by Irvine-based LPA, Inc., the Student Recreation Center, which opened in January 2012, will serve as a campus gathering place and as a recruitment tool for prospective students.
The two-story complex incorporates a three-court gymnasium, a multi-activity-court, and an 18,500-sf weight and fitness space, among other cutting-edge exercise equipment and amenities. On the eastern portion of the structure, C.W. Driver erected a glass façade, which acts as a “human billboard” to advertise activities to the neighboring community.
C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the center’s LEED Gold certification, such as the use of recycled materials, green roof and cool roof systems, and photovoltaic panels to optimize energy performance. Much of the complex’s exterior consists of glass and the lighting system is enhanced by solatubes, allowing 90 percent of the center to benefit from natural light.
Additionally, solar panels installed on the roof and a ventilation system that moves air naturally through the building contribute to the building’s energy conservation. BD+C
Related Stories
| Oct 14, 2011
Midwest construction firms merge as Black and Dew
Merger is aimed at increasing market sector capabilities and building on communication and core contracting competencies.
| Oct 14, 2011
AIA Continuing Education: optimizing moisture protection and air barrier systems
Earn 1.0 AIA/CES learning units by studying this article and passing the online exam.
| Oct 12, 2011
BIM Clarification and Codification in a Louisiana Sports Museum
The Louisiana State Sports Hall of Fame celebrates the sporting past, but it took innovative 3D planning and coordination of the future to deliver its contemporary design.
| Oct 12, 2011
Vertical Transportation Systems Reach New Heights
Elevators and escalators have been re-engineered to help building owners reduce energy consumption and move people more efficiently.
| Oct 12, 2011
Building a Double Wall
An aged federal building gets wrapped in a new double wall glass skin.
Office Buildings | Oct 12, 2011
8 Must-know Trends in Office Fitouts
Office designs are adjusting to dramatic changes in employee work habits. Goodbye, cube farm. Hello, bright, open offices with plenty of collaborative space.
| Oct 12, 2011
FMI’s Construction Outlook: Third Quarter 2011 Report
Construction Market Forecast: The general economy is seeing mixed signs.
| Oct 12, 2011
Bulley & Andrews celebrates 120 years of construction
The family-owned and operated general contractor attributes this significant milestone to the strong foundation built decades ago on honesty, integrity, and service in construction.
| Oct 12, 2011
Consigli Construction breaks ground for Bigelow Laboratory Center for Ocean Health
Consigli to build third phase of 64-acre Ocean Science and Education Campus, design by WBRC Architects , engineers in association with Perkins + Will
| Oct 11, 2011
AIA introduces five new documents for use on sustainable projects
These new documents will be available in the first quarter of 2012 as part of the new AIA Contract Documents service and AIA Documents on Demand.