flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

C.W. Driver completes Rec Center on CSUN campus

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.


By By BD+C Staff | April 11, 2012
C.W. Driver utilized a variety of sustainable building practices during construc
C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the centers LEED Gold cer

C.W. Driver completed construction on the new, 118,000-sf Student Recreation Center at California State University, Northridge, (CSUN) in Northridge, Calif.

Located centrally on campus and designed to LEED Gold standards by Irvine-based LPA, Inc., the Student Recreation Center, which opened in January 2012, will serve as a campus gathering place and as a recruitment tool for prospective students.

The two-story complex incorporates a three-court gymnasium, a multi-activity-court, and an 18,500-sf weight and fitness space, among other cutting-edge exercise equipment and amenities. On the eastern portion of the structure, C.W. Driver erected a glass façade, which acts as a “human billboard” to advertise activities to the neighboring community.

C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the center’s LEED Gold certification, such as the use of recycled materials, green roof and cool roof systems, and photovoltaic panels to optimize energy performance. Much of the complex’s exterior consists of glass and the lighting system is enhanced by solatubes, allowing 90 percent of the center to benefit from natural light.

Additionally, solar panels installed on the roof and a ventilation system that moves air naturally through the building contribute to the building’s energy conservation. BD+C

Related Stories

| Jul 24, 2014

Glazing options in correctional and detention facilities

Like it or not, the number of incarcerated people in the U.S. continues to rise. With that, increased security in all aspects of these facilities continues to be a priority. This is where security glazing products that allow line of sight for supervisors to observe and still maintain secure separation can play a key role. SPONSORED CONTENT  

| Jul 23, 2014

Holistic care model, regulatory changes make outpatient facilities a high priority [2014 Giants 300 Report]

With the Affordable Care Act still in its infancy, Building Teams are seeing reverberations in the investment decisions of healthcare providers, including new ideas about the types of buildings they are asked to create.

| Jul 23, 2014

Meet Acquario Ceará: The giant crustacean-shaped aquarium that's causing concerns

A new aquarium on Brazil's northeastern coast is designed, engineered, constructed and financed by U.S. firms and institutions.

| Jul 23, 2014

Top Healthcare Sector Construction Firms [2014 Giants 300 Report]

Turner, McCarthy, and Skanska USA top Building Design+Construction's 2014 ranking of the largest healthcare contractors and construction management firms in the U.S.

| Jul 23, 2014

Top Healthcare Sector Engineering Firms [2014 Giants 300 Report]

AECOM, Jacobs, and URS Corp. top Building Design+Construction's 2014 ranking of the largest healthcare engineering and engineering/architecture firms in the U.S.

| Jul 23, 2014

Top Healthcare Sector Architecture Firms [2014 Giants 300 Report]

HDR, Stantec, and HKS top Building Design+Construction's 2014 ranking of the largest healthcare architecture and architecture/engineering firms in the U.S.

| Jul 23, 2014

Tallest skyscraper in South Korea now open

The Northeast Asia Trade Tower stands at 308 meters and is the focal point of the Songdo International Business District, a new 310-hectare city built on reclaimed land. 

| Jul 23, 2014

Architecture Billings Index up nearly a point in June

AIA reported the June ABI score was 53.5, up from a mark of 52.6 in May.

| Jul 22, 2014

L.A.'s tallest tower to get observation deck

U.S. Bank Tower, as part of a series of improvements, will be getting an observation deck and restaurant at its top.

| Jul 22, 2014

Herzog & de Meuron unveil curvy concrete condo in Manhattan

Herzog & de Meuron have released renderings of their new $250 million New York building, a 12-story condominium with 88 luxury apartments. 

boombox1
boombox2
native1

More In Category




Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021