flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

C.W. Driver completes Rec Center on CSUN campus

C.W. Driver completes Rec Center on CSUN campus

The state-of-the-art fitness center supports university’s goal to encourage student recruitment and retention.


By By BD+C Staff | April 11, 2012
C.W. Driver utilized a variety of sustainable building practices during construc
C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the centers LEED Gold cer

C.W. Driver completed construction on the new, 118,000-sf Student Recreation Center at California State University, Northridge, (CSUN) in Northridge, Calif.

Located centrally on campus and designed to LEED Gold standards by Irvine-based LPA, Inc., the Student Recreation Center, which opened in January 2012, will serve as a campus gathering place and as a recruitment tool for prospective students.

The two-story complex incorporates a three-court gymnasium, a multi-activity-court, and an 18,500-sf weight and fitness space, among other cutting-edge exercise equipment and amenities. On the eastern portion of the structure, C.W. Driver erected a glass façade, which acts as a “human billboard” to advertise activities to the neighboring community.

C.W. Driver utilized a variety of sustainable building practices during construction, contributing to the center’s LEED Gold certification, such as the use of recycled materials, green roof and cool roof systems, and photovoltaic panels to optimize energy performance. Much of the complex’s exterior consists of glass and the lighting system is enhanced by solatubes, allowing 90 percent of the center to benefit from natural light.

Additionally, solar panels installed on the roof and a ventilation system that moves air naturally through the building contribute to the building’s energy conservation. BD+C

Related Stories

BIM and Information Technology | Mar 4, 2015

Why China's CCTV building needed a WiFi retrofit

It took a year-long retrofit to get WiFi transmission issues solved at China's iconic skyscraper.

High-rise Construction | Mar 4, 2015

Must see: Egypt planning 656-foot pyramid skyscraper in Cairo

Zayed Crystal Spark Tower will stand 200 meters tall and will be just a short distance from the pyramids of Giza. 

Transit Facilities | Mar 4, 2015

5+design looks to mountains for Chinese transport hub design

The complex, Diamond Hill, will feature sloping rooflines and a mountain-like silhouette inspired by traditional Chinese landscape paintings.

Energy Efficiency | Mar 4, 2015

DOE launches crowdsourcing website for technology innovators

The Oak Ridge National Laboratory launched a new crowdsourcing website called the Buildings Crowdsoucing Community to collect and share ideas by innovators for energy-efficient technologies to use in homes and buildings.

Multifamily Housing | Mar 3, 2015

10 kitchen and bath design trends for 2015

From kitchens made for pet lovers to floating vanities, the nation's top kitchen and bath designers identify what's hot for 2015.

Office Buildings | Mar 3, 2015

Former DuPont lab to be converted into business incubator near UPenn campus

The new Pennovation Center will provide collaborative and research spaces for educators, scientists, students, and the private sector.

Sponsored | BIM and Information Technology | Mar 3, 2015

The great debate: Is 3D PDF really BIM?

You can pull apart buildings, cut through floors, and view simulated animation for assembly instructions all within a PDF.

K-12 Schools | Mar 2, 2015

BD+C special report: What it takes to build 21st-century schools

How the latest design, construction, and teaching concepts are being implemented in the next generation of America’s schools.

Codes and Standards | Mar 2, 2015

Proposed energy standard for data centers, telecom buildings open for public comment

The intent of ASHRAE Standard 90.4P is to create a performance-based approach that would be more flexible and accommodating of innovative change.

K-12 Schools | Mar 1, 2015

Are energy management systems too complex for school facility staffs?

When school districts demand the latest and greatest, they need to think about how those choices will impact the district’s facilities employees.

boombox1
boombox2
native1

More In Category


Museums

The Tampa Museum of Art will soon undergo a $110 million expansion

In Tampa, Fla., the Tampa Museum of Art will soon undergo a 77,904-sf Centennial Expansion project. The museum plans to reach its $110 million fundraising goal by late 2024 or early 2025 and then break ground. Designed by Weiss/Manfredi, and with construction manager The Beck Group, the expansion will redefine the museum’s surrounding site.



Reconstruction & Renovation

Movement to protect historic buildings raises sharp criticism

While the movement to preserve historic buildings has widespread support, it also has some sharp critics with well-funded opposition groups springing up in recent years. Some opponents are linked to the Stand Together Foundation, founded and bankrolled by the Koch family’s conservative philanthropic organization, according to a column in Governing magazine.

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021