The Concrete Reinforcing Steel Institute (CRSI) has named a new chairman at its 88th Annual Conference in Washington, D.C.
Matthew L. Brace, Vice President Central Region – CMC Americas, Commercial Metals Company, was elected CRSI chairman on May 1. He joined Commercial Metals Company in 2000 as a Regional Sales Representative for the South Carolina mill. Since then, he has worked as the general manager of sales for both the South Carolina and Alabama mills, the vice president of sales for all of the Americas’ mills, in marketing for the Americas and in sales for the Rebar Fabrication division His current duties include Central Region P&L management for the fabrication, recycling, and mill operations.
In addition, Scott Stevens of Dimension Fabricators was elected to the board of directors. He will serve a two-year term. Stevens was also elected vice-chair.
The CRSI 2012 Board of Directors Officers and Executive Committee members include:
- Chairman Mathew Brace, CMC Americas, Seguin, Texas
- Vice-Chairman Scott Stevens, Dimension Fabricators, Scotia, N.Y.
- Secretary/Treasurer Michael Deis, Dayton Superior, Dayton, Ohio
- Past Chairman John P. Simmet, Simcote, St. Paul, Minn.
- James (Pete) L. Diggs, Gerdau, Nashville, Tenn.
- Robert J. Stone, Nucor Steel, Charlotte, N.C. +
Related Stories
| Feb 28, 2012
Waste Management awards companies for sustainable construction
This recognition, highlighting sustainable performances within the construction industry, looks to celebrate the builders who achieved important sustainability milestones in 2011, as determined by Waste Management’s online Diversion and Recycling Tracking Tool.
| Feb 28, 2012
Salem State University Library & Learning Commons topped off
When it opens to students in the fall of 2013, the $60 million facility will offer new archival space; circulation and reference areas; collections; reading spaces; study rooms; instruction labs and a Dean’s suite.
| Feb 28, 2012
More than 1,000 have earned EDAC certification since 2009
Milestone achieved as evidence-based design becomes a top 2012 strategy for healthcare organizations.
| Feb 28, 2012
McCarthy completes second phase of San Diego’s Scripps Hospital
Representing the second phase of a four-phased, $41.3 million expansion and remodeling project, the new addition doubles the size of the existing emergency department and trauma center to encompass a combined 27,000 square feet of space.
| Feb 28, 2012
LUMEnergi names Weinbaum president and CEO
Weinbaum’s experience spans communications, nanotechnology, electronics components, consumer products, semiconductors, software, wireless and lighting.
| Feb 28, 2012
Griffin Electric completes Medical University of South Carolina project
The 210,000-sf complex is comprised of two buildings, and houses research, teaching and office areas, plus conference spaces for the University.
| Feb 27, 2012
Consigli complete first building for Bigelow Ocean Sciences Campus
Designed by WBRC Architects Engineers in association with Perkins + Will.
| Feb 27, 2012
Hollister completes fit-out of 41,500-sf office space in Princeton, N.J.
Intricate interior project involved construction of more than 80 offices.
| Feb 27, 2012
Research Institute at Texas Children’s Hospital building receives LEED Gold
Innovative and sustainable design reflects best environmental building practices.