flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CRSI appoints Brace chairman

CRSI appoints Brace chairman

Stevens also elected to board of directors and vice-chair.


By Posted by Tim Gregorski, Senior Editor | May 11, 2012
Matthew L. Brace
Matthew L. Brace

The Concrete Reinforcing Steel Institute (CRSI) has named a new chairman at its 88th Annual Conference in Washington, D.C.

Matthew L. Brace, Vice President Central Region – CMC Americas, Commercial Metals Company, was elected CRSI chairman on May 1. He joined Commercial Metals Company in 2000 as a Regional Sales Representative for the South Carolina mill. Since then, he has worked as the general manager of sales for both the South Carolina and Alabama mills, the vice president of sales for all of the Americas’ mills, in marketing for the Americas and in sales for the Rebar Fabrication division His current duties include Central Region P&L management for the fabrication, recycling, and mill operations.

In addition, Scott Stevens of Dimension Fabricators was elected to the board of directors. He will serve a two-year term. Stevens was also elected vice-chair.

The CRSI 2012 Board of Directors Officers and Executive Committee members include:

  • Chairman Mathew Brace, CMC Americas, Seguin, Texas
  • Vice-Chairman Scott Stevens, Dimension Fabricators, Scotia, N.Y.
  • Secretary/Treasurer Michael Deis, Dayton Superior, Dayton, Ohio
  • Past Chairman John P. Simmet, Simcote, St. Paul, Minn.
  • James (Pete) L. Diggs, Gerdau, Nashville, Tenn.
  • Robert J. Stone, Nucor Steel, Charlotte, N.C. +

Related Stories

Architects | Jul 19, 2022

Perkins Eastman Bolsters Its Dallas Studio with 5 Dynamic New Principals

Seasoned staff bring talent, experience, and enthusiasm to expand firm.

Energy-Efficient Design | Jul 19, 2022

All is not lost: 3 ways architects can respond to the Supreme Court’s EPA ruling

The U.S. Supreme Court’s ruling to limit the Environmental Protection Agency’s power to regulate greenhouse gas (GHG) emissions from power plants dealt a significant blow to our ability to fight the climate crisis with federal policy.

Office Buildings | Jul 19, 2022

Austin adaptive reuse project transforms warehouse site into indoor-outdoor creative office building

Fifth and Tillery, an adaptive reuse project, has revitalized a post-industrial site in East Austin, Texas.

Women in Design+Construction | Jul 18, 2022

Registration is open for BD+C's 2022 Women in Design+Construction Conference

Join your AEC industry peers in Chicago, September 26-28, 2022, for the 7th annual Women in Design+Construction Conference, hosted by the BD+C editorial team and the 35-person WIDC Advisory Board. 

Airports | Jul 18, 2022

FAA will award nearly $1 billion for airport projects

The Federal Aviation Administration (FAA) will award nearly $1 billion to 85 airports of all sizes across the country to improve terminals.

Building Team | Jul 18, 2022

Understanding the growing design-build market

FMI’s new analysis of the design-build market forecast for the next fives years shows that this delivery method will continue to grow, despite challenges from the COVID-19 pandemic.

Mixed-Use | Jul 18, 2022

Mixed-use development outside Prague uses a material made from leftover bricks

Outside Prague, the Sugar Factory, a mixed-used residential development with public space, marks the largest project to use the sustainable material Rebetong. 

Building Team | Jul 15, 2022

ABC: Construction materials prices increased in June, up 20% from a year ago

Construction input prices increased 1.9% in June compared to the previous month, according to an Associated Builders and Contractors analysis of U.S. Bureau of Labor Statistics’ Producer Price Index data released today.

Arenas | Jul 15, 2022

U. of Oregon renovation aims for ‘finest track and field facility in the world’

The renovation of the University of Oregon’s Hayward Field had the goal of creating the “finest track and field facility in the world.”

Building Team | Jul 14, 2022

ABC’s construction backlog inches lower in June; Contractor confidence falters

Associated Builders and Contractors reports today that its Construction Backlog Indicator fell 0.1 months in June and stands at 8.9 months, according to an ABC member survey conducted June 21 to July 5.

boombox1
boombox2
native1

More In Category



Urban Planning

The magic of L.A.’s Melrose Mile

Great streets are generally not initially curated or willed into being. Rather, they emerge organically from unintentional synergies of commercial, business, cultural and economic drivers. L.A.’s Melrose Avenue is a prime example. 


Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 

halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021