flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cross-laminated timber performs better than expected in shear test

Codes and Standards

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.


By Peter Fabris, Contriubting Editor | May 18, 2021

Courtesy Pixabay

The American Wood Council recently released the results of full-scale tests of cross-laminated timber (CLT) diaphragms.

The findings indicated that the connections performed better than expected, resulting in higher-than-expected shear capacities of the diaphragms.

“In order to fully understand the full-scale CLT diaphragm test results done last year, we needed to better understand some of the connections that were used in the full-scale tests,” said AWC Vice President of Engineering Bradford Douglas, P.E. “The results of these latest tests could lead to changes allowing more efficient CLT diaphragm designs in the future.”

The tests were conducted in support of new criteria for the CLT diaphragm design approach included in the 2021 Special Design Provisions for Wind and Seismic (SDPWS). The connection testing augments the full-scale diaphragm testing completed in 2020 and focuses on the structural performance of the individual connections of the diaphragm, designed in accordance with the National Design Specification for Wood Construction.

Related Stories

| Jun 14, 2012

USGBC co-founder launches rating system for building product manufacturers

U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.

| Jun 14, 2012

Green standard set for single-ply roofing membrane

A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.

| Jun 14, 2012

Minnesota Vikings stadium plan gets legislative go-ahead

Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.

| Jun 14, 2012

Report alleges New York’s prevailing construction wages are miscalculated, costing billions

A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.

| Jun 14, 2012

AGC, other business groups oppose hiring rules for disabled

Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.

| Jun 5, 2012

HP Labs aims for net-zero energy data centers

Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.

| Jun 5, 2012

USGBC delays LEED 2012; renames it LEED v4

In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.

| Jun 5, 2012

Baltimore officials vow to block $1.8 billion urban renewal project

Baltimore officials want to block a $1.8 billion urban renewal project until more neighborhood residents and minority contractors are hired and displaced residents can benefit from the revitalization.

| Jun 5, 2012

OSHA launches campaign to warn of heat dangers in outdoor work

The Occupational Safety and Health Administration has begun a campaign to warn outdoor workers about the dangers of heat exposure.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021