flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cross-laminated timber performs better than expected in shear test

Codes and Standards

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.


By Peter Fabris, Contriubting Editor | May 18, 2021

Courtesy Pixabay

The American Wood Council recently released the results of full-scale tests of cross-laminated timber (CLT) diaphragms.

The findings indicated that the connections performed better than expected, resulting in higher-than-expected shear capacities of the diaphragms.

“In order to fully understand the full-scale CLT diaphragm test results done last year, we needed to better understand some of the connections that were used in the full-scale tests,” said AWC Vice President of Engineering Bradford Douglas, P.E. “The results of these latest tests could lead to changes allowing more efficient CLT diaphragm designs in the future.”

The tests were conducted in support of new criteria for the CLT diaphragm design approach included in the 2021 Special Design Provisions for Wind and Seismic (SDPWS). The connection testing augments the full-scale diaphragm testing completed in 2020 and focuses on the structural performance of the individual connections of the diaphragm, designed in accordance with the National Design Specification for Wood Construction.

Related Stories

Codes and Standards | Sep 14, 2017

Gentrification means a new mindset for city planners

Rising rents elicit reexamination of zoning principles.

Codes and Standards | Sep 13, 2017

OSHA issues extension for compliance with crane operator certification requirements

Comments on proposed rule sought through Sept. 29.

Codes and Standards | Sep 12, 2017

Washington, D.C. is first LEED Platinum city in the world

All city government buildings are powered by renewables.

Codes and Standards | Sep 11, 2017

Natural solutions would be most effective flood resilience policies for Houston

New green infrastructure should be part of rebuild.

Codes and Standards | Sep 8, 2017

Los Angeles luxury high-rise is first U.S. apartment building to achieve WELL Multifamily certification

Hollywood Proper Residences have verified indoor air and water quality features.

Codes and Standards | Sep 7, 2017

More than half of Houston properties at high or moderate risk of flooding are not in FEMA flood zone

Properties outside of these zones are not required to carry flood insurance.

Codes and Standards | Sep 6, 2017

Seventy percent of contractors have trouble finding workers

AGC survey indicates that fewer companies may be able to bid on projects.

Codes and Standards | Sep 5, 2017

New CTBUH initiatives to investigate link between fire and façades

In wake of Grenfell tragedy, Council forms new workgroup.

Codes and Standards | Sep 1, 2017

U.S. markets with the largest hotel construction pipeline

New York has the largest hotel construction pipeline of any U.S. market.

Codes and Standards | Aug 30, 2017

Trump rescinds elevation requirements for federally funded buildings and infrastructure

Flood protection on subsidized housing, hospitals, and other public buildings rolled back.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021