flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cross-laminated timber performs better than expected in shear test

Codes and Standards

Cross-laminated timber performs better than expected in shear test

Tests conducted in support of new criteria for design of CLT diaphragm.


By Peter Fabris, Contriubting Editor | May 18, 2021

Courtesy Pixabay

The American Wood Council recently released the results of full-scale tests of cross-laminated timber (CLT) diaphragms.

The findings indicated that the connections performed better than expected, resulting in higher-than-expected shear capacities of the diaphragms.

“In order to fully understand the full-scale CLT diaphragm test results done last year, we needed to better understand some of the connections that were used in the full-scale tests,” said AWC Vice President of Engineering Bradford Douglas, P.E. “The results of these latest tests could lead to changes allowing more efficient CLT diaphragm designs in the future.”

The tests were conducted in support of new criteria for the CLT diaphragm design approach included in the 2021 Special Design Provisions for Wind and Seismic (SDPWS). The connection testing augments the full-scale diaphragm testing completed in 2020 and focuses on the structural performance of the individual connections of the diaphragm, designed in accordance with the National Design Specification for Wood Construction.

Related Stories

Codes and Standards | Jan 26, 2018

Flying drones while inebriated now illegal in New Jersey

Violators could be sentenced to six months in jail.

Codes and Standards | Jan 25, 2018

OSHA penalties for violations increase

Fines adjusted for inflation in the New Year.

Codes and Standards | Jan 23, 2018

Disaster mitigation strategies that exceed code could save billions

Four dollars saved for every dollar spent, says NIBS report.

Codes and Standards | Jan 19, 2018

U.S. construction fatalities rose 6% in 2016

Falls accounted for 39% of deadly accidents.

Codes and Standards | Jan 18, 2018

Record storm surge in Boston prompts renewed calls for flood mitigation infrastructure

Newer buildings constructed in flood zone fared well.

Codes and Standards | Jan 17, 2018

Green Building Initiative acquires global rights to Green Globes from JLL

Transaction allows GBI to expand operations to Canada and elsewhere.

Codes and Standards | Jan 16, 2018

Engage code officials early for better building performance, predictable enforcement expectations

White paper says code officials should be collaborators and facilitators.

Codes and Standards | Jan 12, 2018

Arlington County, Va., earns first LEED for Communities Platinum Certification

Honor recognizes efforts to reduce greenhouse gas emissions, manage stormwater.

Codes and Standards | Jan 11, 2018

TRUE Zero Waste provides roadmap to divert waste away from landfills

USGBC program signs on more than 130 companies or facilities for certification.

Codes and Standards | Jan 10, 2018

Sliding-scale proposal for civil damages resulting from construction fatalities, injuries draws ire of trades

New York City Council proposal puts limits on penalties for safety violations leading to death, serious injury.

boombox1
boombox2
native1

More In Category

Geothermal Technology

Rochester, Minn., plans extensive geothermal network

The city of Rochester, Minn., home of the famed Mayo Clinic, is going big on geothermal networks. The city is constructing Thermal Energy Networks (TENs) that consist of ambient pipe loops connecting multiple buildings and delivering thermal heating and cooling energy via water-source heat pumps.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021