flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Critics slam proposed revamp of California’s solar net energy metering rate

Codes and Standards

Critics slam proposed revamp of California’s solar net energy metering rate

Could make rooftop solar panels unaffordable for most customers.


By Peter Fabris, Contributing Editor | January 25, 2022
Solar panels

Courtesy Pixabay

A proposed revision of California’s solar net energy metering rate would be disastrous for the goal of advancing solar power, according to a utility rate design expert and economist.

As reported at PV magazine, the proposed decision by the California Public Utilities Commission would increase the payback period for rooftop solar to over 20 years, according to Dr. Ahmad Faruqui. Under current rules, the payback period is between seven and nine years. The expected lifespan of solar panels is 20 to 25 years, making a 20-year payback unattractive to most homeowners, critics charge.

The new proposal would mean that a customer with a moderate system size of 7 kW would pay an additional $56 per month for fixed charges alone. In addition, the plan would lower solar export payments by nearly 80%.

Proposal opponents are calling on Gov. Gavin Newsom to intervene.

Related Stories

| Jun 21, 2012

On net-zero projects, Building Teams will be held accountable for energy-efficiency performance

The building team will be held accountable for how net-zero energy buildings perform two, five, and maybe ten years after completion.

| Jun 14, 2012

USGBC co-founder launches rating system for building product manufacturers

U.S. Green Building Council co-founder David Gottfried’s new venture, Regenerative Ventures, has established a rating system for building product manufacturers.

| Jun 14, 2012

Green standard set for single-ply roofing membrane

A sustainability standard has been established for single-ply roofing membranes used on commercial buildings.

| Jun 14, 2012

Minnesota Vikings stadium plan gets legislative go-ahead

Legislation that approved the construction of a new billion dollar stadium for the Minnesota Vikings passed the Minnesota legislature.

| Jun 14, 2012

Report alleges New York’s prevailing construction wages are miscalculated, costing billions

A miscalculation in how prevailing wages are calculated in New York reportedly costs the state $3 billion a year in public-infrastructure projects.

| Jun 14, 2012

AGC, other business groups oppose hiring rules for disabled

Business groups have asked the U.S. Department of Labor to reconsider a proposed hiring quota aimed at federal contractors pertaining to people with disabilities.

| Jun 5, 2012

HP Labs aims for net-zero energy data centers

Building sustainable data centers is one of the goals of HP Labs, and it believes technology, combined with the right building techniques, could result in the construction of energy-efficient data centers.

| Jun 5, 2012

USGBC delays LEED 2012; renames it LEED v4

In response to concerns by LEED users, the U.S. Green Building Council (USGBC) announced that it will delay the ballot on LEED 2012 until June 1, 2013.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021