flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Crazy commuting: British artist wants to construct 300-foot water slide on city street

Crazy commuting: British artist wants to construct 300-foot water slide on city street

If the project is successful, Jerram will distribute information allowing other cities to build similar slides.


By BD+C Staff | March 28, 2014

Luke Jerram hopes, with the right funding, to build a 300-foot water slide in the heart of Bristol, England.

Considered an art installation, the slide is meant encourage people to think about how they use the city and what they want it to become in the future.

The slide would go up for one day–May 4, 2014–on Park Street, which has a steep incline. 

"As artists, architects, planners, and just the public, maybe it’s up to us to think of how we want to use the city, and what sort of future we want to see,” Jerram told Complex. "I suppose I think this slide is sort of an experiment, an arrow pointing in one particular direction."

His "Park and Slide" concept is currently on Spacehive.com, as Jerram is crowdfunding the more than $9,000 project. According to Complex, if the project is successful, Jerram will distribute instructions so that other cities can build their own slides. 

The slide has already had a trial run and has been approved by the Bristol City Council.

The public will not only be free to use the slide, states the appeal for funding, but, "like many of Jerram's large-scale art projects, Park and Slide requires public participation to be activated and invites anyone to come and have a go."

Related Stories

| May 10, 2012

Chapter 6 Energy Codes + Reconstructed Buildings: 2012 and Beyond

Our experts analyze the next generation of energy and green building codes and how they impact reconstruction.

| May 10, 2012

Chapter 5 LEED-EB and Green Globes CIEB: Rating Sustainable Reconstruction

Certification for existing buildings under these two rating programs has overtaken that for new construction.

| May 10, 2012

Chapter 4 Business Case for High-Performance Reconstructed Buildings

Five reconstruction projects in one city make a bottom-line case for reconstruction across the country.

| May 10, 2012

Chapter 3 How Building Technologies Contribute to Reconstruction Advances

Building Teams are employing a wide variety of components and systems in their reconstruction projects.

| May 10, 2012

Chapter 2 Exemplary High-Performance Reconstruction Projects

Several case studies show how to successfully renovate existing structures into high-performance buildings.

| May 9, 2012

Chapter 1 Reconstruction: ‘The 99% Solution’ for Energy Savings in Buildings

As a share of total construction activity reconstruction has been on the rise in the U.S. and Canada in the last few years, which creates a golden opportunity for extensive energy savings.

| May 9, 2012

International green building speaker to keynote Australia’s largest building systems trade show

Green building, sustainability consultant, green building book author Jerry Yudelson will be the keynote speaker at the Air-Conditioning, Refrigeration and Building Systems (ARBS) conference in Melbourne, Australia.

| May 9, 2012

Tishman delivers Revel six weeks early

Revel stands more than 730 feet tall, consists of over 6.3 milliont--sf of space, and is enclosed by 836,762-sf of glass.

| May 9, 2012

Stoddert Elementary School in DC wins first US DOE Green Ribbon School Award

Sustainable materials, operational efficiency, and student engagement create high-performance, healthy environment for life-long learning.

| May 9, 2012

Shepley Bulfinch given IIDA Design award for Woodruff Library?

The design challenges included creating an entry sequence to orient patrons and highlight services; establishing a sense of identity visible from the exterior; and providing a flexible extended-hours access for part of the learning commons.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021