flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.


By Posted by Tim Gregorski, Senior Editor | September 6, 2012
Designed by Heery International and slated to open in October 2014, the four-sto
Designed by Heery International and slated to open in October 2014, the four-story, 90,000-sf facility will also include the rec

Charles Perry Partners, Inc. (CPPI) has been awarded a $30.3 million construction management contract for the University of Florida’s Harrell Medical Education Building, a state-of-the-art facility that will impressively serve as the “new front door” for UF’s College of Medicine.

With construction set to begin next spring, the facility will be the medical school’s first freestanding building. Designed by Heery International and slated to open in October 2014, the four-story, 90,000-sf facility will also include the recently-created H. James Free M.D. Center for Primary Care Education and Innovation. The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine. In addition, the simulation and clinical skills facilities will be available to meet the accreditation requirements for residency training programs and other health science colleges.

Also, the facility will provide the latest in information technology as well as innovative teaching laboratories and support facilities for small-group learning such as the use of simulation/virtual reality and standardized patients for professional development and assessment. Currently, the majority of education of medical students during their first two years occurs in the Communicore building which opened in 1974 as a general health sciences education building. +

Related Stories

| Apr 30, 2012

Gilbane to manage retrofit of the Fraunhofer CSE R&B structure

Building is a first-of-its-kind research and demonstration building for sustainable technologies in Boston's Innovation District.

| Apr 30, 2012

KBE Building completes renovation at the ConnCAT

The $1.2 million project consisted of a 16,000-sf interior renovation.

| Apr 27, 2012

GreenExpo365.com to offer webinars on EPA’s WaterSense Program

Architects and builders interested in developing water-efficient buildings invited to attend free sessions featuring experts discussing water-efficient building practices.

| Apr 27, 2012

APA launches wood design web portal for building and design pros

Design professionals who are members of APA’s Professional Associates are automatically enrolled in the APA Designers Circle program.

| Apr 27, 2012

China Mobile selects Leo A Daly to design three buildings at its new HQ

LEO A DALY, in collaboration with Local Design Institute WDCE, wins competition to design Phase 2, Plot B, of Campus.

| Apr 27, 2012

CSM Group names Comerford as senior project manager

Comerford’s responsibilities include directing and verifying contract compliance by the trade contractors to ensure the owner’s expectations are met in respect to a quality finished project.

| Apr 27, 2012

Hampton Bays Middle School winner of the first National Green Ribbon Schools Program

School was the first LEED-certified public school in the state of New York.

| Apr 26, 2012

USGBC announces inaugural Green Apple Day of Service

On Sept. 29, 2012, participants from all over the world will volunteer to make the schools and campuses in their communities healthier and more sustainable.

| Apr 26, 2012

Gensler's Leiserowitz: Employs holistic philosophy to foster clients' creativity, comfort

Leiserowitz became regional managing principal in Chicago for San Francisco-based architecture and design giant Gensler a little more than a year ago.

| Apr 26, 2012

Blackney Hayes Architects launches new engineering division

The new division, BHH Engineers, will be led by Mark Hershman, PE.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021