flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

CPPI awarded $30.3 million contract for University of Florida’s Harrell Medical Education Building

The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine.


By Posted by Tim Gregorski, Senior Editor | September 6, 2012
Designed by Heery International and slated to open in October 2014, the four-sto
Designed by Heery International and slated to open in October 2014, the four-story, 90,000-sf facility will also include the rec

Charles Perry Partners, Inc. (CPPI) has been awarded a $30.3 million construction management contract for the University of Florida’s Harrell Medical Education Building, a state-of-the-art facility that will impressively serve as the “new front door” for UF’s College of Medicine.

With construction set to begin next spring, the facility will be the medical school’s first freestanding building. Designed by Heery International and slated to open in October 2014, the four-story, 90,000-sf facility will also include the recently-created H. James Free M.D. Center for Primary Care Education and Innovation. The specialized interdisciplinary learning environment will serve as a focal point for integration and program development for all primary care educational activities in the College of Medicine. In addition, the simulation and clinical skills facilities will be available to meet the accreditation requirements for residency training programs and other health science colleges.

Also, the facility will provide the latest in information technology as well as innovative teaching laboratories and support facilities for small-group learning such as the use of simulation/virtual reality and standardized patients for professional development and assessment. Currently, the majority of education of medical students during their first two years occurs in the Communicore building which opened in 1974 as a general health sciences education building. +

Related Stories

| May 24, 2012

2012 Reconstruction Awards Entry Form

Download a PDF of the Entry Form at the bottom of this page.

| May 24, 2012

Gilbane’s Spring 2012 economic report identifies multiple positive economic and market factors

Anticipating increasing escalation in owner costs through 2014.

| May 24, 2012

Construction backlog declines 5.4% in the first quarter of 2012?

The nation’s nonresidential construction activity will remain soft during the summer months, with flat to declining nonresidential construction spending.

| May 24, 2012

Stellar completes St. Mark’s Episcopal Church and Day School renovation and expansion

The project united the school campus and church campus including a 1,200-sf chapel expansion, a new 10,000-sf commons building, 7,400-sf of new covered walkways, and a drop-off pavilion.

| May 23, 2012

MBI Modular Construction Campus Launched on BDCUniversity.com

White Papers, Case Studies, Industry Annual Reports, published articles and more are offered.

| May 23, 2012

Gifford joins Perkins Eastman as principal

Design and planning expertise in science, technology, education, and healthcare.

| May 23, 2012

McRitchie joins McCarthy Building as VP, commercial services in southern California

McRitchie brings more than 18 years of experience in the California construction marketplace.

| May 23, 2012

Arizona Army National Guard Readiness Center awarded LEED Silver

LEED certification of the AZ ARNG Readiness Center was based on a number of green design and construction features SAIC implemented that positively impacted the project and the broader community.

| May 23, 2012

New hospitals invest in data centers to manage growth in patient info

Silver Cross became one of the first hospitals to install patient tracking software so families know where a patient is at all times. New communication equipment supports wireless voice and data networks throughout the hospital, providing access to patients and their families while freeing clinicians to use phones and computers where needed instead of based on location.

boombox1
boombox2
native1

More In Category


Resiliency

Austin area evacuation center will double as events venue

A new 45,000 sf FEMA-operated evacuation shelter in the Greater Austin metropolitan area will begin construction this fall. The center will be available to house people in the event of a disaster such as a major hurricane and double as an events venue when not needed for emergency shelter.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021