flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 public health guidelines may be downplaying building systems solutions

Codes and Standards

COVID-19 public health guidelines may be downplaying building systems solutions

Emphasis on cleaning surfaces overlooks importance of mechanical infrastructure.


By Peter Fabris, Contributing Editor | July 1, 2020

Courtesy Pixabay

As scientists learn more about the COVID-19 virus, opinions are changing on how it is spread from person to person, and that has implications for how to reopen buildings safely.

Emphasis to date on protocols for reopening buildings has focused on surface cleaning and occupant density. But, if as some scientists suspect, the virus can live for at least three hours in aerosols—tiny particles that can be carried through the air for long distances—HVAC systems could play a key role in spreading the virus. There are opposing views on whether aerosols actually can transmit the virus, but if they do, then ventilation systems could spread the virus through unfiltered re-circulation of indoor air.

In April, ASHRAE addressed the issue of possible aerosol transmission with recommendations that include:

· Maintain a relative humidity of 40% to 60% inside buildings instead of the usual 20% to 40%.

· Install air filters rated at least at MERV-13.

· Minimize re-circulation of indoor air, and bring in outside air either by mechanical means or by opening windows.

The humidity recommendation was made because higher humidity makes aerosols heavier, causing them to drop to the floor faster. ASHRAE has also recommended that the intake of outside air be set to the highest level permitted by the mechanical equipment. Some specialists recommend a full re-commissioning process for reopening buildings.

Related Stories

| Jul 5, 2012

Continued tax breaks necessary for widespread adoption of net zero buildings

Tax breaks passed by the U.S. government to encourage construction of green buildings are set to expire in 2012 and 2013.

| Jun 28, 2012

Six buildings now recognized under Living Building Challenge

The Living Building Challenge (LBC), a green ratings system for design and construction that judges a building based on its actual performance, not just its projected performance at the design stage, has recognized six buildings to date.

| Jun 28, 2012

Label for building products will have ‘global warming number’

The director of the 2030 Challenge for Products says that the organization is aiming to place a label on building products that will list what’s in it, and how much embodied carbon each product represents.

| Jun 28, 2012

Top building material executive urges building resilience in sustainability standards

A meeting of 1,000 business executives at the recent Rio+20 environmental conference featured a passionate plea to include building resilience in efforts to boost sustainability.

| Jun 28, 2012

Following spate of skyscraper balcony glass panel breakages, Ontario adopts code change

Ontario's housing minister announced new building code rules to help prevent glass panels from breaking off high-rise balconies during hot weather.

| Jun 28, 2012

Factory worker deaths in Italy raise questions on building codes after earthquakes

Italian officials are questioning seismic building standards and inspection procedures in the aftermath of two damaging earthquakes.

| Jun 21, 2012

Brazilian engineering/construction firm Odebrecht sues Florida over ban on companies doing business in Cuba

Odebrecht Construction Inc., a Brazilian engineering and construction company, is suing the State of Florida over a new law that bans governments from hiring companies with business ties to Cuba.

| Jun 21, 2012

String of shattered glass balcony panels prompts call for code reform in Ontario

Since last summer, glass balconies have shattered at 13 different buildings in Toronto.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021