flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 made payment delays to contractors much worse

Codes and Standards

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.


By Peter Fabris, Contributing Editor | July 1, 2021

The COVID-19 pandemic appears to have made payment delays to contractors much worse, according to a report from construction software firm Levelset.

Just 9% of companies always get paid on time, a decline of 60% from last year, says Levelset’s 2021 Construction Cash Flow & Payment Report. Just one construction contractor in 10 always gets paid in full, a 75% drop from before the pandemic.

GCs typically fare better than subs. General contractors are four times more likely than subcontractors to get paid within 30 days, and 50% more likely to get paid in full. One in five subcontractors and suppliers often have to wait more than 60 days for payment.

A full 56% of subcontractors wait more than 60 days to collect retained funds, compared to just 16% of general contractors.

Related Stories

Codes and Standards | Apr 28, 2020

ASHRAE, WELL panels to tackle revising standards to limit spread of viruses in buildings

Will examine ways to reduce infectious threats through building designs and operations.

Codes and Standards | Apr 24, 2020

Dept. of Labor issues guidance for respiratory protection during N95 shortage

Elastomeric respirators or powered, air-purifying respirators, and expired N95s are allowable alternatives

Codes and Standards | Apr 23, 2020

Group will create ecosystem for smart building data

Seven Finnish companies aim to integrate all technical systems into a single platform.

Codes and Standards | Apr 23, 2020

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.

Codes and Standards | Apr 15, 2020

Embodied carbon footprint can be reduced by using conventional materials

High-SCM concrete, and cellulose and wood fiber insulation among the greener alternatives.

Coronavirus | Apr 13, 2020

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 

Codes and Standards | Apr 13, 2020

Design competition focuses on reducing urban heat island effect

Cool Abu Dhabi aims to transform urban life in the Middle East.

Codes and Standards | Apr 13, 2020

What building science says about reducing COVID-19 transmission

Impact of temperature and relative humidity is unclear.

Codes and Standards | Apr 9, 2020

Owners retrofitting properties, monitoring performance during epidemic

Covid-19 outbreak may lead employers to reevaluate office commitments.

Codes and Standards | Apr 7, 2020

Dept. of Labor publishes guidance on paid sick leave, expanded family and medical leave

Includes fact sheets for employees, employers, and a questions and answers document.

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021