flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 made payment delays to contractors much worse

Codes and Standards

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.


By Peter Fabris, Contributing Editor | July 1, 2021

The COVID-19 pandemic appears to have made payment delays to contractors much worse, according to a report from construction software firm Levelset.

Just 9% of companies always get paid on time, a decline of 60% from last year, says Levelset’s 2021 Construction Cash Flow & Payment Report. Just one construction contractor in 10 always gets paid in full, a 75% drop from before the pandemic.

GCs typically fare better than subs. General contractors are four times more likely than subcontractors to get paid within 30 days, and 50% more likely to get paid in full. One in five subcontractors and suppliers often have to wait more than 60 days for payment.

A full 56% of subcontractors wait more than 60 days to collect retained funds, compared to just 16% of general contractors.

Related Stories

Codes and Standards | May 21, 2018

New standard tests quietness of floors

ASTM International method will help manufacturers test their flooring materials.

Codes and Standards | May 17, 2018

California will require solar panels on most new homes

Projected to add $10,000 to cost of new homes.

Codes and Standards | May 16, 2018

New resources offer tips on off-site construction

NIBS documents address using pre-cast concrete, and commercial and legal considerations of modular construction.

Codes and Standards | May 15, 2018

Blast testing of loaded mass timber structures yields positive results

Four tests covered a spectrum of blast loads.

Codes and Standards | May 14, 2018

Maryland makes general contractors liable for failure of subs to pay employees

GCs could have to pay for up to three times the wages owed.

Codes and Standards | May 10, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

Codes and Standards | May 9, 2018

OSHA and state safety agencies write more than 100 silica citations in 6 months

Actions tending to come with investigation of other site conditions.

Codes and Standards | May 8, 2018

Powerhouse coalition builds energy positive buildings

The goal: build buildings that provide more power than they cost to build, run, and demolish.

Codes and Standards | May 7, 2018

Plan advances in Los Angeles for Climate Emergency Mobilization Department

Would oversee efforts to reduce greenhouse gas emissions across the city.

Codes and Standards | May 3, 2018

Data collection, machine learning boost building efficiency

Sensors, software algorithms squeeze out waste.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021