flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 made payment delays to contractors much worse

Codes and Standards

COVID-19 made payment delays to contractors much worse

Only one in ten companies is always getting paid in full.


By Peter Fabris, Contributing Editor | July 1, 2021

The COVID-19 pandemic appears to have made payment delays to contractors much worse, according to a report from construction software firm Levelset.

Just 9% of companies always get paid on time, a decline of 60% from last year, says Levelset’s 2021 Construction Cash Flow & Payment Report. Just one construction contractor in 10 always gets paid in full, a 75% drop from before the pandemic.

GCs typically fare better than subs. General contractors are four times more likely than subcontractors to get paid within 30 days, and 50% more likely to get paid in full. One in five subcontractors and suppliers often have to wait more than 60 days for payment.

A full 56% of subcontractors wait more than 60 days to collect retained funds, compared to just 16% of general contractors.

Related Stories

Codes and Standards | May 16, 2019

Mixed reviews on targeted tax break for San Francisco neighborhood

“Twitter tax break” may have worsened some of the area’s problems.

Codes and Standards | May 15, 2019

OSHA inspections to increase, says Secretary of Labor

Newly hired inspectors getting up to speed.

Codes and Standards | May 14, 2019

Database records more than 1,360 K-12 school shooting incidents since 1970

Naval Postgraduate School program maps locations nationwide.

Codes and Standards | May 13, 2019

In many cities, downtown housing comes with a hefty premium

Urban core living costs hundreds of thousands more in largest U.S. cities.

Codes and Standards | May 7, 2019

San Francisco plan would require largest commercial buildings to use 100% renewable electricity

First in the U.S. mandate would be phased in from 2022 to 2030.

Codes and Standards | May 7, 2019

ABC says best practices can improve construction companies’ safety by 680%

Daily ‘toolbox safety talks’ were most effective safety measures.

Codes and Standards | May 7, 2019

Office noise significantly reducing employee concentration, productivity, and creativity

Workplace distractions cause some to choose to work remotely.

Codes and Standards | May 7, 2019

WSP USA says it will be carbon neutral in 2019

Engineering firm will offset carbon at all offices and with employee business travel.

Codes and Standards | Apr 25, 2019

Report: Contractors invest $1.6 billion in workforce development annually

ABC members increased training spending 45% from 2013, according to a new report. 

Codes and Standards | Apr 25, 2019

New York City’s Green New Deal would ban all-glass skyscrapers

The ambitious plan would also boost affordable housing, reduce building emissions, and update codes to account for sea level rise.

boombox1
boombox2
native1

More In Category


Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021