flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 epidemic demonstrates value of flexible hospital space

Codes and Standards

COVID-19 epidemic demonstrates value of flexible hospital space

Some rooms being repurposed for ICU care.


By Peter Fabris, Contributing Editor | April 23, 2020

Courtesy Pixabay

The value of flexible hospital space is being demonstrated as administrators rush to increase the number of hospital ICU beds to meet the expected peak in COVID-19 cases.

In many states, regulations require treatment rooms to be different sizes depending on the stage of patient care being provided. Facilities may now be more likely to specify space for acuity-adaptable units that are designed to match the square footage of ICU rooms.

These rooms may not be fully outfitted for ICU capability immediately, but can be retrofitted later to fulfill that purpose. Programming for hospital designs currently in the works are more likely to include how an increased number of beds could be added during future pandemics or other emergencies.

Under extreme demand, spaces that may not have the required square footage under normal circumstances could be outfitted as treatment areas. Spaces such as conference rooms, dining rooms, and parking structures can be repurposed for medical care if suitable utility access is available.

Related Stories

| May 10, 2012

University of Michigan research project pushes envelope on green design

A research project underway at the University of Michigan will test the potential of intelligent building envelopes that are capable of monitoring weather, daylight, and occupant use to manage heating, cooling, and lighting.

| May 10, 2012

Fire suppression agents go greener

Environmental sensitivity is helping to drive adoption of new fire suppression agents.

| May 10, 2012

Industry groups urge Congress to leave contracting decisions to agencies

An organization of several industry groups urged Congress to leave many contracting decisions to the discretion of individual agencies by avoiding blanket mandates.

| May 10, 2012

OSHA proposes new rule to have employers find and fix hazards

The Occupational Safety and Health Administration has proposed a new regulation, Injury and Illness Prevention Program, or I2P2, which would compel employers to find and fix safety hazards.

| May 3, 2012

Stay current on green codes at AGC Environmental Conference

Keep abreast of market trends such as 2012 changes to green standards and codes at the AGC Contractors Environmental Conference, June 7-8, 2012 in Arlington, Va.

| May 3, 2012

OSHA reduces fines in Cincinnati casino collapse

The Occupational Safety and Health Administration has reduced the number of violations from four to two against four firms it cited earlier this month in the collapse of a casino under construction in Cincinnati.

| May 3, 2012

New York City implements controversial crane licensing requirements

New York City officials announced strict new licensing and testing requirements for all crane operators in New York City to raise safety standards.

| May 3, 2012

Green-roof requirement now includes industrial facilities in Toronto

A mandate that requires installation of green roofs on new commercial and residential buildings in Toronto has been expanded to include industrial facilities.

| May 3, 2012

Innovative wastewater treatment helps achieve LEED rating

LEED for New Construction, Neighborhood Development and the LEED Volume Program offer some ways to achieve LEED points when dealing with wastewater treatment.

boombox1
boombox2
native1

More In Category




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021