flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Coronavirus

COVID-19 alert: City conducts a 'virtual building inspection' to allow Starbucks and bank to open

Bothell, Wash., issues a certificate of occupancy to developer after inspecting the property online. 


By Avalon Development | April 13, 2020
Starbucks in Bothell, Wash., gets CO through a virtual building inspection

This Starbucks and an adjacent bank in Bothell, Wash., were opened thanks to a virtual building inspection by the city. The coffeeshop's drive-thru has stayed open through the COVID-19 pandemic.

    

The Seattle bedroom community of Bothell, Wash., lies in one of the metro areas first hit by the COVID-19 crisis. There, a developer worked with the city to complete a virtual inspection, allowing the Starbucks-anchored development to open while the city was in the midst of the pandemic. The coffeeshop remains open via drive thru. 

The new Starbucks drive-thru in Bothell, at 22904 Bothell Everett Highway, was all prepped to open on March 27. But before the property owner, Avalon Development, could hand over the keys to the new 3,990-sf building to co-tenants Starbucks and Washington Federal bank, Avalon had to complete a final building safety inspection with a city government that was in the midst of temporarily shutting down all non-emergency services, including all in-person inspections.

“We were scrambling to get the Starbucks drive-thru open,” said Avalon Development Principal Scott Whittington. “We needed to get our final inspection, but the city and the state were in the midst of shutting down. Luckily, we have a great relationship with the city, and working with DB General Contractors and the local Starbucks real estate management team, we came up with a solution."

The solution: an on-site inspection via FaceTime, with the inspector on live video feed to confirm that the construction met all safety standards.  As a result of the virtual inspection, Avalon Development was issued the certificate of occupancy, allowing the businesses to open.

Thanks to the work-around, the opening of this all-new Starbucks drive-thru was only delayed by two days. “This is a testament of continued perseverance and dedication to craft that is awe-inspiring during this time of continued bad news,” said Garrett Johnson, Vice President at Avalon Development.

Related Stories

Coronavirus | Apr 16, 2020

COVID-19: Pennsylvania building products supplier raises $1.2 million for Pittsburgh-area food bank

Pennsylvania building products supplier raises $1.2 million for Pittsburgh-area food bank.

Coronavirus | Apr 15, 2020

How has your work been impacted by COVID-19?

The SMPS Foundation and Building Design+Construction are studying the impact of the coronavirus pandemic on the ability to attain and retain clients and conduct projects, along with other consequences.

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Coronavirus | Apr 15, 2020

DCAMM teams with SLAM and Gilbane Building Company to re-occupy Newton Pavilion for temporary quarantine of homeless during COVID-19 pandemic

First and only quarantine shelter in Boston-area to convert a shuttered hospital for homeless patient occupancy.

Coronavirus | Apr 15, 2020

3D printing finds its groove fabricating face shields during COVID-19 crisis

The architecture firm Krueck + Sexton is producing 100 shields for a Chicago-area hospital.

Coronavirus | Apr 14, 2020

COVID-19 alert: Missouri’s first Alternate Care Facility ready for coronavirus patients

Missouri’s first Alternate Care Facility ready for coronavirus patients

Coronavirus | Apr 13, 2020

Construction layoffs spread rapidly as coronavirus shuts down projects, in contrast to job gains through February in most metros

Association officials urge quick enactment of infrastructure investment, relief for hard-hit firms and pensions in order to save jobs in construction and supplier industries.

Coronavirus | Apr 12, 2020

How prefab can enable the design and construction industry to bring much needed beds to hospitals, faster

The outbreak of COVID-19 represents an unprecedented test for the global healthcare system. Managing the pandemic—and saving lives—depends largely on the availability of medical supplies, including the capacity of hospitals. But the United States lags behind other nations, with only 2.8 beds per thousand people compared to 4.3 in China and 12.8 in South Korea.

Coronavirus | Apr 10, 2020

HGA and The Boldt Company devise a prefabricated temporary hospital to manage surge capacity during a viral crisis

A STAAT Mod system can be ready to receive patients in less than a month.

Coronavirus | Apr 10, 2020

COVID-19: Converting existing hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients

COVID-19: Converting existing unused or underused hospitals, hotels, convention centers, and other alternate care sites for coronavirus patients 

boombox1
boombox2
native1

More In Category


MFPRO+ Special Reports

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.



halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021