flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Courtyards make Brooklyn’s Bushwick II residential development its own miniature city

Multifamily Housing

Courtyards make Brooklyn’s Bushwick II residential development its own miniature city

Bushwick II will feature light-filled plaza spaces, a roof for urban living, and more than 800 apartment units.


By MIke Chamernik, Associate Editor | July 7, 2016
Courtyards make Brooklyn’s Bushwick II residential development its own miniature city

All renderings courtesy ODA New York. Click here to enlarge.

Considering the interconnected courtyards and 1 million gsf of space, the designers of the Bushwick II residential complex are calling it a “city within a city” in Brooklyn.

Led by developer All Year Management and architects at ODA New York, the project will feature open-air courtyards, covered walkways, and corridors that lead to plazas, shops, galleries, lounges, and fitness areas situated in transparent glass buildings. A 17,850 sf park will cut through the center of the development that will contain 800 to 900 apartment units, 20% of which will be affordable.

Bushwick II will also feature art from local artists, and tenant Rheingold Brewery has a 60,000-sf roof for outdoor urban living. It will have facilities for relaxation and fitness, along with an urban farm.

The development has been met with anti-gentrification backlash, and as Gothamist points out, the pledge for affordable units can be easily sidestepped.

ODA New York designed another residential complex, the 400,000-sf luxury development at 10 Montieth Street, that is being built a few blocks to the north.

(Click images to enlarge)

Related Stories

Coronavirus | Apr 15, 2020

COVID-19 alert: 93% of renters in professionally managed multifamily housing paid some or all of their rent, says NMHC

In its second survey of 11.5 million units of professionally managed apartment units across the country, the National Multifamily Housing Council (NMHC) found that 84% of apartment households made a full or partial rent payment by April 12, up 15 percentage points from April 5.

Multifamily Housing | Apr 15, 2020

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida

Related Group picks Stantec to design and engineer Manor Miramar residences in Florida.

Coronavirus | Apr 5, 2020

COVID-19: Most multifamily contractors experiencing delays in projects due to coronavirus pandemic

The NMHC Construction Survey is intended to gauge the magnitude of the disruption caused by the COVID-19 outbreak on multifamily construction.

Plumbing | Mar 13, 2020

Pioneer Industries launches new website

Pioneer Industries launches new website

Multifamily Housing | Mar 5, 2020

The Aviator apartment community opens near Henderson Executive Airport

The community is inspired by antique airplane designs.

Building Materials | Mar 3, 2020

84 Lumber President Maggie Hardy Knox receives Career Achievement Award

Maggie Hardy Knox, President of 84 Lumber and Nemacolin Woodlands Resort, to receive Career Achievement Award.

Multifamily Housing | Feb 26, 2020

School districts in California are stepping in to provide affordable housing for faculty and staff

One high school district in Daly City has broken ground on 122-apartment building.

boombox1
boombox2
native1

More In Category

Curtain Wall

7 steps to investigating curtain wall leaks

It is common for significant curtain wall leakage to involve multiple variables. Therefore, a comprehensive multi-faceted investigation is required to determine the origin of leakage, according to building enclosure consultants Richard Aeck and John A. Rudisill with Rimkus. 




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021