flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Court ruling may lead to more destructive testing on unfinished Harmon Tower in Las Vegas

Court ruling may lead to more destructive testing on unfinished Harmon Tower in Las Vegas

A Clark County, Nevada district court judge ruled that the unfinished Harmon Hotel at CityCenter, operated and half-owned by MGM Resorts, could not use extrapolation when requesting damages at a possible trial.


August 2, 2012

A Clark County, Nevada district court judge ruled that the unfinished Harmon Hotel at CityCenter, operated and half-owned by MGM Resorts, could not use extrapolation when requesting damages at a possible trial.

Extrapolation is a statistical technique that uses samples to predict how pervasive defects are throughout a building. As a result, MGM Resorts engineers might conduct more destructive testing—knocking off finished concrete to see any steel reinforcement bars inside.

Click here for more information. +

Related Stories

Codes and Standards | Mar 19, 2019

Plan for transformation of Lower Manhattan streetscapes unveiled

Pedestrian-friendly “Slow Streets” pilot starts on Earth Day 2019.

Codes and Standards | Mar 15, 2019

Newly developed building materials could have big impact on sustainability

Transparent wood, self-cooling walls, bricks that filter air pollutants among the technological breakthroughs.

Codes and Standards | Mar 14, 2019

U.S. and Canada differ on how to evaluate field performance of windows, curtain walls

Variations include laboratory test method for determining rate of air leakage.

Codes and Standards | Mar 13, 2019

Climate change can’t be stabilized without addressing urban sprawl

Even if power goes green, transportation will still be a major emissions source.

Codes and Standards | Mar 12, 2019

Virginia county hones new rainwater harvesting standard

Developer prompts new rules to use rainwater for heating and air conditioning.

Codes and Standards | Mar 8, 2019

Portland delays requirement for posted warnings on unreinforced brick and stone buildings

Regulation would mandate signs warning that buildings could be unsafe during earthquakes.

Codes and Standards | Mar 7, 2019

California will allow flame retardant-free building insulation

State also repeals business furniture flammability standard.

Codes and Standards | Mar 5, 2019

Persistent flooding having economic impact on coastal cities

Atlantic City, Annapolis among communities affected.

Codes and Standards | Mar 1, 2019

$1 billion Boston hospital project to include extensive disaster resiliency features

Mass. General expansion will be designed for four days of shelter in place.

boombox1
boombox2
native1

More In Category



Resiliency

U.S. is reducing floodplain development in most areas

The perception that the U.S. has not been able to curb development in flood-prone areas is mostly inaccurate, according to new research from climate adaptation experts. A national survey of floodplain development between 2001 and 2019 found that fewer structures were built in floodplains than might be expected if cities were building at random.


halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021