flexiblefullpage
billboard
interstitial1
catfish1
Currently Reading

Cost to keep Miami dry over next few decades is $4 billion

Codes and Standards

Cost to keep Miami dry over next few decades is $4 billion

Rising seas demand big investment.


By Peter Fabris, Contributing Editor | May 4, 2021

Courtesy Pixabay

It will cost at least $3.8 billion over the next 40 years to keep the City of Miami dry from rising seas, according to a draft of the city’s newly released stormwater master plan.

That sum, about four times the city’s annual budget, would buy the city new mega stormwater pumps, miles of 6-foot-tall sea walls, thousands of injection wells, and a network of eight-foot diameter underground pipes. These measures, though, are not likely to keep all neighborhoods dry.

Miami faces rising ocean levels due to the effects of global climate change. Even the best engineering options now being considered cannot fully mitigate this phenomenon, though city officials say the expense will be beneficial and keep Miami livable largely as is through 2060.

The report also alludes to a future decades later that includes floating cities and converting roads to canals.

Related Stories

| Aug 11, 2010

Best AEC Firms of 2011/12

Later this year, we will launch Best AEC Firms 2012. We’re looking for firms that create truly positive workplaces for their AEC professionals and support staff. Keep an eye on this page for entry information. +

boombox1
boombox2
native1

More In Category

Warehouses

California bill would limit where distribution centers can be built

A bill that passed the California legislature would limit where distribution centers can be located and impose other rules aimed at reducing air pollution and traffic. Assembly Bill 98 would tighten building standards for new warehouses and ban heavy diesel truck traffic next to sensitive sites including homes, schools, parks and nursing homes.




halfpage1

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021